Timetables
			
			Posted 
		
		
			
				
			
			
		
		
			
				
					#146433
				
			
			
				(In Topic #8031)
				
			
		
	 
				Site staff
				
For the operation of our Rail Empire
Timetables is something developed that life revolves around and to which we adapt.In this hobby, we have many choices on how we run our trains and the following is three methods that I know of–
1. Ad Hoc - whatever the User wants to do
2. Some order by following a sequence such as a DMU, then a local goods followed by a block coal/stone/oil train
3. Timetables to determine what train & when.
I am fortunate to be able to say that I operate on layouts that follow variations & adaptions of both points 2 & 3 and based on experiences gained, I have developed such a system for the D&S.
More to come, so stay with me.
					Ron
NCE DCC ; 00 scale UK outline.
			NCE DCC ; 00 scale UK outline.
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Site staff
				
I work on a real running time of 2 hours and use a PC clock - visible to all - that runs 3 times faster so my Session time runs for 6 hours so I set up some trains in times as this example shows
 
	
this is for the Train Controller and I think it is self explanatory - if not please ask.
This allows the Train Controller to set all points for trains leaving or arriving through Junctions & in/out of storage tracks in time for teh movement of trains
Now as each of the three main operating points do not need to know all details, I provide an abridged version for their location - Charde as the example
 
	
bit more to come.
					Ron
NCE DCC ; 00 scale UK outline.
			NCE DCC ; 00 scale UK outline.
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Site staff
				
Now where was I?
I think ………………
the only timed trains are 5 passenger, 3 gravel, one tanker & one cattle and they are different for each sequence in starting times & the direction they travel; all other 7 goods fit in as time allows & if a train is not completed in one Op Session, it will be finished the next time.
I am working on 6 sequences which normally take 6 real months to go through before we start again.
The colours are so each station is identified & in the case of Tawnton, they are aware of passenger trains being driven in by the Charde operator & so need to set appropriate tracks for the platforms.
Was that understood? questions?
					Ron
NCE DCC ; 00 scale UK outline.
			NCE DCC ; 00 scale UK outline.
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Site staff
				
					Ron
NCE DCC ; 00 scale UK outline.
			NCE DCC ; 00 scale UK outline.
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Full Member
				
			Bob
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Site staff
				
					Ron
NCE DCC ; 00 scale UK outline.
			NCE DCC ; 00 scale UK outline.
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Site staff
				
To this end, I have done many spreadsheets and the crew on the D&S use these in our 3 operating sessions each month .
One such session is attached and one Train Order from that is session follows
 
	
each session takes about 2 real hours & with fast clocks of 5:1, the D&S is run 10 hours per session. As with anything like this, it is continually evolving with tweeks happening each time - some minor & others not so minor
The names of Charde, Tawnton & Marabost on the Order are those of the actual Operator as they cannot follow the train around due to lack of physical room but hand the train & order onto the next station. DCC does make this easier than DC .
					Ron
NCE DCC ; 00 scale UK outline.
			NCE DCC ; 00 scale UK outline.
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Site staff
				
 
	
and this photo shows half of the operating space looking from the doorway
					Ron
NCE DCC ; 00 scale UK outline.
			NCE DCC ; 00 scale UK outline.
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Inactive Member
				
			It would take me a while to get my head around that.!!!
:thumbs Gormo
					"Anyone who claims to have never made a mistake, never made anything!!"
https://sites.google.com/site/greatchesterfordmodelrailway/home
			https://sites.google.com/site/greatchesterfordmodelrailway/home
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Full Member
				
			
					Mike
Pig Hill Yard - a small Inglenook shunting layout for my boys, in 00.
			Pig Hill Yard - a small Inglenook shunting layout for my boys, in 00.
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Site staff
				
No real timetables, just worked out what I wanted to run in a session and it developed from that with comments from the crew.One day… One day… This looks great. What did you use to start all of this? Any real-world timetables, or did you just make it up as you went along?
I now have 14 such spreadsheet files - one for each session AM & PM of the 7 days in a week.
The attached has all the goods services & when they get run.
Passenger - DMU's x 2 of and a main line service also run to time in each AM & PM timeslot.
					Ron
NCE DCC ; 00 scale UK outline.
			NCE DCC ; 00 scale UK outline.
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Inactive Member
				
			I`m getting my head around it and I like that.
I have read about and heard about various systems over the years and yours seems to be as good as or better than any I`ve seen.
:cheers Gormo
					"Anyone who claims to have never made a mistake, never made anything!!"
https://sites.google.com/site/greatchesterfordmodelrailway/home
			https://sites.google.com/site/greatchesterfordmodelrailway/home
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Site staff
				
Mine is a mix of the many systems around.
I was "lucky" enough to be involved with a local NMRA member who uses waybills, etc and it was progression from the fixed format I was shown back in 2001 when I joined a local round-robin group of like-minded modellers.
My early days of this fixed format was as per the attached file, made up of two Train Orders TJ 11 & TJ 12 in which TJ 12 reversed what TJ 11 did.
It got to the stage that the crew knew exactly what to do each time they saw the loco come out of storage and they did not need to really read the Order so that is why I started on waybill/wagon cards so the train was completely different each time. A lot of work for me but it does mean variation !
					Ron
NCE DCC ; 00 scale UK outline.
			NCE DCC ; 00 scale UK outline.
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Full Member
				
			Do you have to have the exact number of operators to run the railway, or if too few are available can you, say, not run the mineral train?
Do you have a pool of operators all capable of running any of the planned services or a team with differing levels of competence?
Forgive me if these seem rather facile questions in a technical discussion but I am interested in the 'human logistics' too.
Doug
					'You may share the labours of the great, but you will not share the spoil…'  Aesop's Fables
"Beer is proof that God loves us and wants us to be happy" - Benjamin Franklin
In the land of the slap-dash and implausible, mediocrity is king
			"Beer is proof that God loves us and wants us to be happy" - Benjamin Franklin
In the land of the slap-dash and implausible, mediocrity is king
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Site staff
				
Ron,
Do you have to have the exact number of operators to run the railway, or if too few are available can you, say, not run the mineral train? Yes, I do have the right number but can call on others if some drop out for any reason but if the numbers go too low, then I can drop the passenger services followed by the stone train.
Do you have a pool of operators all capable of running any of the planned services or a team with differing levels of competence?
As Max would be aware, all can operate on my layout - some are more familiar with the concepts than others. I was rotating the crew around the 5 locations every 3 months but are doing it now every two months. The reason is that Tawnton, the main station is more full on than the 3 terminal stations so every one gets some busy & easy sessions.
Forgive me if these seem rather facile questions in a technical discussion but I am interested in the 'human logistics' too.
The Op sessions currently on the D&S are 3 times a month - 2 Wed nights & one Fri night
Doug
					Ron
NCE DCC ; 00 scale UK outline.
			NCE DCC ; 00 scale UK outline.
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Full Member
				
			It certainly adds another dimension to our modelling and is yet another stride away from "playing trains". I wonder if it would work with the likes of RR & Co and how complex it would be to get everything slotted in. I can imagine the schedules would be akin to the formula for an atomic bomb ………………..but it would be a very interesting, and challenging, exercise :hmm
					'Petermac
				
			
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Full Member
				
			Doug
					'You may share the labours of the great, but you will not share the spoil…'  Aesop's Fables
"Beer is proof that God loves us and wants us to be happy" - Benjamin Franklin
In the land of the slap-dash and implausible, mediocrity is king
			"Beer is proof that God loves us and wants us to be happy" - Benjamin Franklin
In the land of the slap-dash and implausible, mediocrity is king
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Full Member
				
			
It certainly adds another dimension to our modelling and is yet another stride away from "playing trains". I wonder if it would work with the likes of RR & Co and how complex it would be to get everything slotted in. I can imagine the schedules would be akin to the formula for an atomic bomb ………………..but it would be a very interesting, and challenging, exercise :hmm
RR&Co has a "fast clock" and a timetable option…….you can write 24 hour timetable for a selected calendar date. So by varying the date you have the ability to produce an almost infinite number of unique timetables.
The timetable can operate both schedules and operation commands…….you can specify a time for dusk or dawn and the lights will come on (if you have them)……if you have sound you could trigger a cock crowing at dawn…..personally that would drive me bonkers but I can visualise it working in certain circumstances
The system works very effectively but I find you still have to produce some parallell documentation in spreadsheet form to keep track of all the associated schedules and sub commands……you are right it is amazingly complex and after eight years I am still only scratching the surface…….
The big disadvantage compared with Ron and his 4 operators is the absence of human intervention………if something goes wrong unless I hit the emergency stop button real quick its a bit like Willie Wonkies chocolate factory going awry…….it would make a hilarious video
			
			Posted 
		
		
			
				
			
			
		
		
	 
				Full Member
				
			I prefer a sequence myself as I operate on my own and do not want to feel under pressure from a clock. Actually its 4 sequences covering Tuesday, Thursday, Saturday and Sunday where Thursday is market day on the branch but early closing in the main town. I have 3 Sunday sequences, 5 for Tuesday, 7 for Thursday and 11 for Saturday. It becomes clear that the sequence will run 1155 times (3x5x7x11) before the days repeat themselves.
The idea is that, whichever Tuesday sequence is run, the trains end up in the right place to start any Thursday sequence and so on. This may require some empty stock workings but that's fine because that's how it was on the real railway and that is what I am striving to achieve.
Making variations is done by running or not running optional trains, running A rather than B (especially if A and B are PW options), running A and B and so on. Also, extra vans can be attached to trains, strengthener coaches put on or relief services run. Note that the variations on train type refer to passenger trains only. Its actually easier to have 11 variations you think.
Freight trains run in fixed rakes and so the variations are train A or train B. The stopping freight trains are opersated as per my YouTube video "Stopping Freight On Yarlsow" - link below.
Stopping Freight on Yarslow
Hope some people find this useful. Its not the best system but it works for me and I guess that's what it's all about :)
					Shed dweller, Softie Southerner and Meglomaniac
				
			
			
			Posted 
		
		
			
				
			
			
		
		
	Inactive Member
				
			However at most a dozen trains each way each day doesn't make for huge interest.
So I chose war time, and in particular 29th May 1940. When the timetables were thrown out of the window. You had evacuation trains and ambulance trains coming through from the south coast with men from Dunkirk. Meanwhile ammunition trains which had been pre ordered were still on their way south. If the locals were lucky a normal passenger train might just get a path through.
For the Exhibition section of the layout it will be very simplified 4 trains ready for each way in the fiddle yard, taking turns, with just the occasional local / freight / horse box from a passenger train being dropped off.
For Me going over complicated at a show with a strict timetable is too prone to points failure / loco failure, you need to keep things happening for 99% of punters…
					Now I've finally started a model railway…I've inherited another…
				
			
			
				
				
					1 guest and 0 members have just viewed this.
				
			
			
		

 
						
					
					