 Posted: Mon Oct 27th, 2008 08:08 am
PMQuoteReply
link to this 1st post
MaxSouthOz
Admin


Joined: Sat Aug 23rd, 2008
Location: Adelaide , Australia
Posts: 12331
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Behind a row of hills, is the Salt Creek bypass, a pair of overtaking loops in the double track. To run past a train, it has to be parked in a loop and then the turnouts changed to the other line. This operation is done via CCTV. To see where the locos are stopping needs a reference point. I thought a simple signal bridge at each end, would be just the thing.



For this signal bridge, you will need two Bachmann kits number 45134 and one Cornerstone caged ladder set number 933-2956



First step. Assemble the kits, but don't attach the walkways.



Cut the legs off one of the kits and cement the two together. There may be some filing required to get the two to match. Then cut the hand rails off one side. This will allow easy access for your soldering iron.



Drill holes in the fish plates on the gantry and insert red/green LEDs so that the legs pair up with those opposite. Cut the legs off the LEDs and solder together.



Solder a 1k ohm resistor (for 14vDC) to each side of each pair of LEDs and a wire to each of the common legs (centre). Pull the two sets of three wires through to the rear supports and CA glue them to the posts.



A view from above showing the wiring, resistors and LEDs. The leds are wired together so that they operate as a pair of pairs for each bridge and when each LED is green, its partner is red and vice versa.



Next fit the walkways and hand rails. Assemble the caged ladder and attach it to the front end of the walkway.



Lay the bridge on its side and apply thick CA glue to the collar of each LED. Drop a 3/8" x 1/8" flat washer on to each led to form the frame of the signal lamp. Turn the bridge over and repeat the process for the other four LEDs.



Here is a close up shot of the detail so far.



Here is the bridge just back from the spray shop. I used short lengths of shrink tubing to mask the LEDs and a plastic bag to mask the wires.



Glue short lengths of brass tubing cut at 45 degrees with a Dremel, to make the lamp shields. Paint the shields and frames matt black. I made a 14v DC power supply (left of picture) from a toroidal transformer and bridge rectifier, for testing LEDs. Hook the bridge up to the power supply for a final test.



Here is the bridge installed on the eastern end of the bypass. The wires go through the concrete footings and drop down through the base board on the end nearest to the hill.



Here is a shot of the bypass, showing both bridges. The freight train is still "in the hole" waiting for the passenger train to pass. Note the red and green signals for that pair of tracks. The signals are connected to the turnout motors and indicate the clear path for each pair of turnouts at that end.



A close up of the bridge, again looking west, showing more detail of the construction.



and finally, looking east towards the bridge and cutting at Cripple Creek.



____________________
Max
Port Elderley
Back To Top PMQuoteReply

 Posted: Mon Oct 27th, 2008 08:24 am
PMQuoteReply
link to this 2nd post
owen69
Former Member
 

Joined: 
Location:  
Posts: 
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

an interesting post Max, i like the idea and build method
really good.

:thumbs;-):lol::lol::cool:

Back To Top PMQuoteReply

 Posted: Mon Oct 27th, 2008 08:52 am
PMQuoteReply
link to this 3rd post
Wayne Williams
Member


Joined: Mon Oct 15th, 2007
Location: Hudson, Florida USA
Posts: 2627
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Nice post Max, great detail, and it really looks the part.

Wayne



____________________
My Layout "The South Shore Line":
http://yourmodelrailway.net/view_topic.php?id=509&forum_id=21
Back To Top PMQuoteReply

 Posted: Mon Oct 27th, 2008 11:27 am
PMQuoteReply
link to this 4th post
Alan
Former Member
 

Joined: 
Location:  
Posts: 
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Thanks Max  for posting such an interesting thread, are you going to weather them.

Back To Top PMQuoteReply

 Posted: Mon Oct 27th, 2008 11:38 am
PMQuoteReply
link to this 5th post
phill
Hello


Joined: Sat Oct 13th, 2007
Location: Lancing West Sussex, United Kingdom
Posts: 6449
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

I like this mate, very interesting and dare i say it even i could maybe have a go :shock:

Phill

Back To Top PMQuoteReply

 Posted: Mon Oct 27th, 2008 01:05 pm
PMQuoteReply
link to this 6th post
Ken
Member


Joined: Sun Oct 21st, 2007
Location: Okehampton, Devon., United Kingdom
Posts: 1345
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

I'm a bit in awe at this Max, particularly the electrics; great job.   I think we should have a new term: "Maxbuilt" (instead of scratchbuilt!!!).:thumbs

Ken.



____________________
'It don't mean a thing if it ain't got that Swing'
Back To Top PMQuoteReply

 Posted: Mon Oct 27th, 2008 01:54 pm
PMQuoteReply
link to this 7th post
Bob K
Member


Joined: Sun Oct 14th, 2007
Location: Bedfordshire, United Kingdom
Posts: 2748
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Max, a super project with very effective results. can you just explain the red/green LED for me. Does each LED (ie all 8) have the ability to flip between red and green or have I got that wrong?

Bob(K)

 

Back To Top PMQuoteReply

 Posted: Mon Oct 27th, 2008 03:13 pm
PMQuoteReply
link to this 8th post
georgejacksongenius
Kettle Watcher


Joined: Thu Feb 28th, 2008
Location: Hyde,Cheshire, United Kingdom
Posts: 2488
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Great build,Max.I'm not only impressed with the electrics,but the way you've disguised all the wires and stuff.
  Good job!!!

Cheers,John.B.

Back To Top PMQuoteReply

 Posted: Mon Oct 27th, 2008 04:12 pm
PMQuoteReply
link to this 9th post
MaxSouthOz
Admin


Joined: Sat Aug 23rd, 2008
Location: Adelaide , Australia
Posts: 12331
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Thanks for the positive feedback, guys.
Yes, Alan. I want to get some proto pics so I can copy the rusting on them and also on the girder bridge at Cripple Creek.I tend to knock things around a bit when I mount them, so the painting can be tidied up then. Let's just say that they have been recently installed . . .
Bob(K), the LEDs are three legged red/green which behave as though two LEDs have been built into one. The centre leg is common and the outside two are for red and green. One has a right angle bend at the top and the other is at 45 degrees. Two leg LEDs usually need a diode to change colours.
I can post the circuit if anyone is interested. Cheers Max



____________________
Max
Port Elderley
Back To Top PMQuoteReply

 Posted: Mon Oct 27th, 2008 05:21 pm
PMQuoteReply
link to this 10th post
Sol
Former Member
 

Joined: 
Location:  
Posts: 
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Max, bi-colour LEDs -

3 legged as you say - a simple changeover switch to power either leg.  2 -legs needs a full reversing switch as they require a complete reversal of power. 

 I have used both types depending on the circuit: 3 legs for signals:    2 legs  connected across diodes  being in series   with output of track power under analogue control  indicates if a loco motor is present.  (If anyone in analogue wants a copy of the circuit, PM me with their e-mail address.)

Now Max, the next step is to have the signals change automatically as trains go under the gantry so that Red means that either the track is not set for exit at the far end or the track already has a train in it.

Back To Top PMQuoteReply

 Posted: Mon Oct 27th, 2008 05:45 pm
PMQuoteReply
link to this 11th post
MaxSouthOz
Admin


Joined: Sat Aug 23rd, 2008
Location: Adelaide , Australia
Posts: 12331
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

I think you missed it, Sol. The 3 leg LEDs are connected directly to the DPDT switches in the Tortoise motors. They don't require any relays to work. They behave the same way as globes. Two leg LEDs use reversed current to change colour and I use 1N4007 power diodes for that, but I haven't used 2 leg here. I used diodes in my block current detectors as the signals have 2 leg LEDs. I fed them with DCC AC off the bus and switched them with the Tortoise via the diodes - if all that makes sense.

The signals display the orientation of the turnouts, not the presence of a loco in the block. As you can see, the other bypass has no train, but the signals are still showing the orientation of the turnouts which feed the two tracks at each end.

Cheers. Max

 



____________________
Max
Port Elderley
Back To Top PMQuoteReply

 Posted: Mon Oct 27th, 2008 05:51 pm
PMQuoteReply
link to this 12th post
Sol
Former Member
 

Joined: 
Location:  
Posts: 
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Max. no, I understand on how you have the 3 legged LEDs connected, but by adding additional circuitry, they can do two jobs- occupation as well as how track ahead is set.

2legged LEDs with DCC AC - I will test that a bit later today.

Back To Top PMQuoteReply

 Posted: Tue Oct 28th, 2008 12:12 am
PMQuoteReply
link to this 13th post
MaxSouthOz
Admin


Joined: Sat Aug 23rd, 2008
Location: Adelaide , Australia
Posts: 12331
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Sol. In deference to my unshakable (welded on even) adherence to the principle of KISS, I only have one function. The hilarious thing is, that I only needed a pole or the like as a reference point for spotting trains on the CCTV. I originally had pencils standing in holes drilled in the base board, as you saw last time you were here; but No, I had to show off, didn't I? Now you want me to add occupancy? Give me a break . . . LOL



____________________
Max
Port Elderley
Back To Top PMQuoteReply

 Posted: Fri Oct 31st, 2008 06:43 pm
PMQuoteReply
link to this 14th post
Robert
Legacy Member


Joined: Sat Oct 13th, 2007
Location: Benidorm, Alicante, Spain
Posts: 12264
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Yet another good 'un for our Forum Index.



____________________

Barchester
Back To Top PMQuoteReply

This is topic ID = 3003     Current time is 02:13 pm  
You are here:  Your Model Railway Club > Getting You Started. > The Lineside. > Signals > Building a Signal Bridge
You can type a quick reply to this topic here. Click in the box below to begin.

Or to reply to an individual post, or to include images, attachments and formatted text,
click the Quote or Reply buttons on each post above.

To start a new topic in this forum, click the Start New Topic button below.
To start a new topic in a different forum, click the Forum Jump drop-down list below.
Start New Topic

Back to top of page

           
15 Most Recent Topic

Problems with this web site? Please contact the Webmaster.

All material submitted to this web site is the responsibility of the respective contributor. By submitting material to this web site you acknowledge that you accept full responsibility for the material submitted.
Unless stated otherwise, all the material displayed on this web site, including all text, photographs, drawings and other images, is copyright and the property of the respective contributor. Registered members are welcome to use it for their own personal non-commercial modelmaking purposes. It must not be reproduced or re-published elsewhere in any form, or used commercially, without first obtaining the owner's express permission.
The owner of this web site may edit, modify or remove any content at any time without giving notice or reason.    © 2008

                 

Recent Topics Back to top of page

Powered by UltraBB 1.15 Copyright © 2007-2011 by Jim Hale and Data 1 Systems. Page design copyright © 2008-2013 Martin Wynne. Photo gallery copyright © 2009 David Williams.