Recent Topics      
YMR logo

You are here:  Your Model Railway Club > Getting You Started. > Electrics - DC > Turnouts - operating process To bottom of page
                 

 Moderated by: Spurno  
AuthorPost
Sol
A modelling Moderator.


Joined: Mon Nov 28th, 2011
Location: Evanston Gardens, South Aust, Australia
Posts: 4367
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

I am planning some minor track changes with the inclusion of one newturnout in a seemingly convoluted area
showing existing


new turnout #4


The Existing works now well but I will have to change some relay operating sequences  that activate solenoids to  work to the Planned change - going to be interesting to work this out.

C never goes direct to E, to get to E from C requires going via A all the way around the layout.


                 

Recent Topics Back to top of page

Powered by UltraBB 1.15 Copyright © 2007-2011 by Jim Hale and Data 1 Systems. Page design copyright © 2008-2013 Martin Wynne. Photo gallery copyright © 2009 David Williams.