Battery Street Sidings.
Posted
#228647
(In Topic #12486)
Legacy Member
More dereliction on a door
Having only ever produced individual derelict building and dioramas of the same, I though I might have a go at a complete layout following the same theme and albeit only 6' 6" long by 2' 9" wide I still managed to get plenty in and, hopefully, captured the typical atmosphere of run down and neglected industry.It's not quite finished yet, just bits here and there to do and waiting for a few Dapol wagons to arrive then I can put up more pictures later. So, meanwhile, the current scheme of things to date.
Allan.
Posted
Legacy Member
Such things look complicated but are in fact very simple to build. This one took only a couple of hours from start to plonk using Plastruct components , wood dye, talcum powder and green paint.
Posted
Full Member
:cheers
John
John
Posted
Site staff
VBG Allan :thumbs
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Legacy Member
Now then, Sol. I'm sure that once you make up you're mind what you're going to build, you'd get it built in no time. It's all about 10% think, 90% build.
Allan.
Posted
Full Member
John
John
Posted
Legacy Member
The Peco points however can be a bit troublesome and have a built in switch at the tie bar that changes the frog polarity ( though I don't know why it has to ) therefore cannot be hard wired for electrical continuity and just rely on contact at the end of the point blade which is guaranteed to fail miserably so I drop a piece of loose wire in between the point blades and the the stock rail which seems to do the trick but,no doubt, every member on here bar me could find a more sophisticated solution !
Allan
Posted
Full Member
I haven't had a chance to get to grips with the Peco points in my possession yet Allan. I do recall beating my head against the wall with the old Code 100 points that relied on the blade contact against the stock rail for route selection.
I am quite sure there's a way to improve things but I suspect it'll be tricky now that the points are down. Still if you've got them working best to leave them.
John
John
Posted
Legacy Member
Allan
Posted
Full Member
John
John
Posted
Inactive Member
Fantastic!
Excellent!
Marvellous!
What else have I got . . . ?
! ! !
Max
Port Elderley
Port Elderley
Posted
Site staff
And true,once I make my mind up about changes, no holding me back,,
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Legacy Member
Allan.
Posted
Full Member
Marty
Posted
Legacy Member
What I really need is a GWR Pannier or something to help it out but I'm not going to buy one because I know for sure that I've got one buried somewhere that I haven't seen for years - come out you little swine wherever you are !!
Anyway, here's the pictures for you to look at while I go rooting for it…
Allan
Posted
Legacy Member
Or layout boards, Marty.Very evocative, I like the remains of the signal box. Someone has stripped the cladding away for some other purpose… firewood or the allotment shed maybe.
Marty
I really shouldn't be telling anyone this but I used scaffold planks for my very first layout - a disaster if ever there was in N Gauge - where I nailed the track down with carpet tacks hammered between the rails !! Well, I was a builder you know and built it in a converted pig sty - read that as roof raised and weather proofed - where the tin roof blew off in the first gale and I haven't seen it since !
Well, one had to start somewhere…
Allan
Posted
Full Member
And here I was expecting the track lifting gang with the backhoe and flat wagons for rails and sleepers.
Nigel
©Nigel C. Phillips
Posted
Inactive Member
What will be its fate?
Max
Port Elderley
Port Elderley
Posted
Legacy Member
Allan.
Posted
Inactive Member
I'm very sorry to hear that.
On both counts.
Max
Port Elderley
Port Elderley
1 guest and 0 members have just viewed this.