Return visit to BUNCOMBE GWR

Post

Posted
Rating:
#292667 (In Topic #22064)
Avatar
Full Member

a 2023 `quicky` layout that went mouldy

It`s been quite a while since i added anything to this site so I`m starting a new layout thread…….

Twobolt John
Online now: No Back to the top

Post

Posted
Rating:
#292668
Avatar
Full Member
20240128_121217.jpg Unfortunately,  all the significant kit built buildings on the first rendition of Buncombe went mouldy January 2023 in my non-insulated shed.   It was strange that only one particular manufacturers products were affected when all others were fine !!

It was mentioned to me that the lasercut material may have been contaminated before the kits were produced and the mould lay in wait……..

They could not be saved despite several attempts, so a new set of buildings have been made since then.

But first I had to attend to the shed…… which has now been insulated…

20250624_132231.jpg


 

Twobolt John
Online now: No Back to the top

Post

Posted
Rating:
#292670
Avatar
Full Member
.  So, only the original platform survived which I primed with `Shellac` before construction with thick card…..

And then it has been a case of making new buildings.



20230702_194533-COLLAGE.jpg

Twobolt John
Online now: No Back to the top

Post

Posted
Rating:
#292671
Avatar
Full Member
The new signal box is from a Monks Gate Models kit…… as is the new Station building and replacement tunnel 20250801_191142.jpg  6e459c91-4a79-4640-abe7-0cc8203839df~1.jpg
20250518_121001.jpg

Twobolt John
Online now: No Back to the top

Post

Posted
Rating:
#292672
Full Member
Nice looking buildings.

Cheers Pete.
Online now: No Back to the top

Post

Posted
Rating:
#292673
Avatar
Full Member

peterm said

Nice looking buildings.

I totally agree!

Cheers,
Claus
www.flickr.com/photos/ellef/
Online now: Yes Back to the top

Post

Posted
Rating:
Item has a rating of 5 (Liked by Ed)
#292676
Avatar
Full Member
Image20250924_150827.jpg


20250924_150827.jpg
(Click to enlarge)
Image20250924_150835~2.jpg


20250924_150835~2.jpg
(Click to enlarge)
Imageimage.jpg


image.jpg
(Click to enlarge)
Image20250924_175519.jpg


20250924_175519.jpg
(Click to enlarge)
Thankyou Folks,

This summer I have been able to get a lot of this project moved forward using Intentio laser cut sheets and Laser Lines laser cut paving slabs.

This time I have made all buildings removeable which ,of course, means I have had to make them sort of `plug and socket`

the Station building was a challenge……..

…..but I`m pleased with the result………..
 Image20250928_190905.jpg


20250928_190905.jpg
(Click to enlarge)
Image20251005_162028.jpg


20251005_162028.jpg
(Click to enlarge)

Twobolt John
Online now: No Back to the top

Post

Posted
Rating:
Item has a rating of 5 (Liked by Ed)
#292756
Avatar
Full Member
Image

20251029_192946.jpg

20251029_192946.jpg

(Click to enlarge)


Twobolt John
Online now: No Back to the top

Post

Posted
Rating:
#292766
Full Member
Looking Good John.

John.
Online now: No Back to the top

Post

Posted
Rating:
#292767
Full Member
The presence of O stands out even when there's no stock in the pic'.

Cheers Pete.
Online now: No Back to the top

Post

Posted
Rating:
#292768
Avatar
Full Member
Yes I agree - the larger scale offers loads of scope for detailing.

Is the track hand built ?

Nice shiney work space !!

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#292774
Avatar
Full Member

Petermac said

Yes I agree - the larger scale offers loads of scope for detailing.

Is the track hand built ?

Nice shiney work space !!

Thanks folks!

yes, the track is hand built using a mix of Peco bullhead rail, twobolt rail chairs, ply sleepers and Peco point templates which are shorter in length than absolute scale plans.

Image

P1010023.JPG

P1010023.JPG

(Click to enlarge)


Twobolt John
Online now: No Back to the top
1 guest and 0 members have just viewed this.