Building an N-Gauge Scalescenes High Street

Post

Posted
Rating:
#161928
Avatar
Full Member

Tracking the cost and time needed to make a High Street for Tedderton

Looking nice and solid too…

If, once completed, you can get us a photo, through a window, where we can see a ceiling rose…. You'll be doing well.

Marty

Last edit: by Marty


Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#161937
Full Member
Looking good. :thumbs

Terry
Online now: No Back to the top

Post

Posted
Rating:
#161954
Avatar
Full Member
Cracking on apace this week…

I've added the internal lights to the three buildings. In a few rooms I have added a 2mm warm white LED and associated resistor. I've stuck copper tape down the sides of the buildings to carry the current. My theory is that there should be enough space to add a 'groove' to the downpipe layers that go on next, before the external walls, thus sandwiching the copper strip into the wall construction and leaving it invisible from the outside.

Time will tell, but they all work and look good so far!






Time taken: 6 hours

Cost: £24.87

Mistakes: 0 :lol:

Last edit: by emmess


Mike
Pig Hill Yard - a small Inglenook shunting layout for my boys, in 00.
Online now: No Back to the top

Post

Posted
Rating:
#161955
Avatar
Full Member
If, once completed, you can get us a photo, through a window, where we can see a ceiling rose…. You'll be doing well.

Marty

Ha ha! No chance! :???:

Mike.

Mike
Pig Hill Yard - a small Inglenook shunting layout for my boys, in 00.
Online now: No Back to the top

Post

Posted
Rating:
#162070
Avatar
Full Member
Phew! It works. The copper strip embeds nicely into the make up of the walls.

The external walls are made up of a thin downpipe section, another thin section, and a thick section, which is wrapped with the bricks on an external cover layer.

By cutting a long strip out of the downpipe layer to accommodate the copper strip, and then two big holes out of the thick layer to accommodate my sloppy soldering, it all goes together flat, once the exposed ends of the LEDs and resistors are sunk into little grooves cut out of the surface of the card.

Here are the components of the walls, with their grooves and holes cut out:




And then with the downpipe and thick layer in place (just resting there - not stuck down):




Once the external wall is on, it all looks good:




And here's a view from the bottom, showing the copper strip in its groove:




Time taken: 8 hours

Cost: £24.96


Mistakes: 0 :lol:

Mike
Pig Hill Yard - a small Inglenook shunting layout for my boys, in 00.
Online now: No Back to the top

Post

Posted
Rating:
#162074
Avatar
Full Member
Nice work Michael and the idea with the copper strip is something I will have to try.

Keep it up.

Regards,
Trevor
Online now: No Back to the top

Post

Posted
Rating:
#162075
Avatar
Full Member
Very neat… Something to try in my plasticard buildings… Keep it coming…

Marty

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top
1 guest and 0 members have just viewed this.