A new station on the D and S

Post

Posted
Rating:
#241812
Avatar
Full Member
Track work on the D&S… just like old times!
Following along.

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#241815
Avatar
Full Member
[user=19]Marty[/user] wrote:
Track work on the D&S… just like old times!
……………………………..
:mutley :mutley :mutley :mutley

Real "deja vu" Marty …………………………..

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#241817
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Because this DMU


is moving into Watchit
 
into that dead end track under the road bridge which is used for local loco storage,I have to find another location for the Watchit locos so before I get stuck into Marabost,. I have to do some shufflings and another turnout in Watchit


the cattle dock will be moved, the dock track extended for two locos and a brake van track installed

And here I thought my track laying days was over   Doh!

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#241820
Avatar
Full Member
Oh well. At least it's only tweaking small sections (Knock on wood).
Online now: No Back to the top

Post

Posted
Rating:
#241823
Avatar
Full Member
You carry on Sol (there are plenty of us that remember how good you are at relaying track as Peter says)…. it's always fun to watch… and quite prototypical really…. 

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#241825
Ed
Avatar
Site staff
Ed is in the usergroup ‘Super-moderators’
You need an Orange Army, Sol  :mutley



Ed

Last edit: by Ed

Online now: No Back to the top

Post

Posted
Rating:
#241921
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
With Watchit trackwork done, got back into Marabost - part of the old West Watchit track gone.


the rest & turnout still to be removed and the area cleaned up.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#242097
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
The turnout on the Watchit track now gone so the work at Marabost starts on Wednesday after coming Tuesday night Operating session




Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#242098
Avatar
Inactive Member
It would be good to go back and have a look at what the layout was like when it was first built.

Every change has been an improvement.   :cool:
Online now: No Back to the top

Post

Posted
Rating:
#242101
Avatar
Legacy Member
Good bit of tracfkitting there Ron i know its not easy fitting in a bit of track that length when its fixed down either side.
Its a case of how far can i bow it without permanently bending it if you want to use full length joiners.


Brian

OO gauge DCC ECOS Itrain 4 computer control system
Online now: No Back to the top

Post

Posted
Rating:
#242103
Avatar
Full Member
I'm with Brian here Sol - a nice bit of engineering Sir !!  Looks great. 

I'm guessing the bridge has a road leading down the far side of it …………………………………… :roll: :roll:

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#242104
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
In answer to Brians' question re joining - it was easy with  code 100 to 75 means soldered joins… but it always means close measuring and sliding fishplates.
and yes Peter, a road leading down & I will see if I can locate a photo.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#242105
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#242106
Avatar
Full Member
I remember it now Sol - thanks.  I really do like your layout - plenty of activity and variation. 

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#242261
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
With the wall removed- platform need to be bricked up - edge slabs still to be added in the fullness of time..


the bay track removed


the turnout is next to be lifted.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#242282
Avatar
Full Member
Ooo, how barren and empty it looks… 

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#242287
Avatar
Full Member
It looks as if Mr Beeching has had his axe out! I'm, sure all will be restored in due course with service as normal, including strong BR tea and cheese sarnies.

Bon courage Sol,

Bill

At 6'4'', Bill is a tall chap, then again, when horizontal he is rather long and people often used to trip over him! . . . and so a nickname was born :)
 
Online now: No Back to the top

Post

Posted
Rating:
#242289
Avatar
Legacy Member
Cooking on gas now Ron give it a few days and we will be seeing trains running.


Brian

OO gauge DCC ECOS Itrain 4 computer control system
Online now: No Back to the top

Post

Posted
Rating:
#242309
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#242311
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top
1 guest and 0 members have just viewed this.