A new station on the D and S

Post

Posted
Rating:
#197283
Ed
Avatar
Site staff
Ed is in the usergroup ‘Super-moderators’
Lovely scene Ron, I can almost hear the birds singing and the cows mooing :thumbs

Ed

Online now: No Back to the top

Post

Posted
Rating:
#241353
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Been quite a while between drinks but reading about other layouts & the changes, this is one  station Marabost  that will undergo some changes ( the name is based on the operators on the D&S)
As it is now - the two tracks on the right hand side all relate to another station Watchit….




As the main platform is not long enough for a 4 coach train  plus loco, there will be some changes.
The wall that separates the platform  from the track with the distant DMU comes down, that DMU track  will be re-worked back into Marabost and the wall rebuilt to separate the right hand track that serves another station; main platform will be extended and a small bay for parcels, etc .
So over the next few weeks ( after I have installed a replacement control panel), I will have photos of demolition & rebuild.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#241355
Avatar
Legacy Member
Major upgrade there Ron look forward to watching you develop it.

Brian

OO gauge DCC ECOS Itrain 4 computer control system
Online now: No Back to the top

Post

Posted
Rating:
#241358
Avatar
Full Member
I too look forward to seeing the upgrade… and pleased I am not alone in making changes to my track.  Don't feel such a numpty now!

Regards

Michael
Online now: No Back to the top

Post

Posted
Rating:
#241359
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
OK  the  plan - before & after
 


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#241364
Avatar
Legacy Member
Ron i assume the arrowed line top right goes across your lift up ?

Brian

OO gauge DCC ECOS Itrain 4 computer control system
Online now: No Back to the top

Post

Posted
Rating:
#241373
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Brian, the top RH arrow is the entry/exit for Marabost


the bottom LH arrow is what goes across the liftup


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#241375
Avatar
Full Member

I love this photo Sol :



Presumably, the idea is that the left hand "Watchet" track will become a platform track on Marabost thus giving a full length platform face rather than the existing 2 bays which effectively cut the length in half………….. :hmm

Knowing how you work, I'll look forward to seeing the finished altertions in about 20 minutes ……………………….. :lol: :lol:



'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#241384
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Peter, one of my mates is going to a video using a camera on a flat car pushed around the layout very soon and I don't think I will get this work finished in time.
I will take photos as I demolish & rebuild.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#241385
Avatar
Full Member
I'll look forward to the video Ron - it will give a real "feel" to the layout - "Solly Productions Inc." …………..you could pose Marty's Miss Davies on the wagon for advertising…………..then it really would be a "flat car" ……….   :mutley

In the meantime, we'll enjoy the stills of the demolition and rebuild ………….. :thumbs

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#241399
Avatar
Full Member
Good luck with the rebuild Ron…….I will follow with interest. Its your constant search to improve the D&S operationally that inspires me to keep modifying Granby’s track
Best wishes

John

John
Granby III
Lenz DCC,RR&Co Gold V10 A4 Windows 10
Online now: No Back to the top

Post

Posted
Rating:
#241454
Avatar
Full Member
Lovely to see the D&S again Sol, 
The current two tracks associated with Watchit are storage tracks aren’t they. Does the reduction in storage space  mean a reduction in traffic to Watchit or a rearrangement of the timetable to suit the reduced space.

Nice to see the greenery and buildings too.

Looking forward to the updates.

All the best

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#241467
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Marty, one of the tracks currently is West Watchit, the other going over the liftup is the entry/exit for Watchit.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#241798
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
The video has been done today by a mate who is learning how to edit & post it into Youtube so I have started
Before
 

the wall has gone & hopefully can be reused.


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#241799
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
The bay platform came up easy as it was not joined by much - just the paper top


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#241800
Avatar
Full Member
That's a benefit to papercraft scenery.

Last edit: by ZeldaTheSwordsman

Online now: No Back to the top

Post

Posted
Rating:
#241801
Avatar
Full Member
You really must post more photos Sol - I forgot how good the D & S is.  It all looks very "normal" and realistic.

This photo suggests this isn't the first time there have been major alterations here ……………………..I can see the outline of previous track work under where the bay platform sat…………… :roll:  As I said, more photos please !!!



'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#241804
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
this will give some indication of what is going where…


  

  and yes Peter, there have been many changes on that part of the baseboard….

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#241806
Avatar
Legacy Member
Good progress there Ron is the new terminus platform meant for a end to end shuttle service?

Brian

OO gauge DCC ECOS Itrain 4 computer control system
Online now: No Back to the top

Post

Posted
Rating:
#241811
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Brian, there ws a 2 car DMU service that started from the bay but will become a 3 car service when all track work completed.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top
1 guest and 0 members have just viewed this.