A new station on the D and S

Post

Posted
Rating:
#158984 (In Topic #8993)
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Marabost, to sit 150mm/ 6" above storage sidings

The railcar is on the entry track

The sidings next to the wall are also upper level storage - making a total of 31 such sidings on the D&S




The supports are in - some are threaded rods due to insufficient space tween tracks



 

From the aisle - will not be enclosed to allow for access if required




To discuss tonight with the operating crew a few things such as panel or not for the switches to operate solenoid motors.




Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#158985
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
The top boards cut to shape - to be joined up & more supports







Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#158997
Avatar
Full Member
Can't you sleep Sol ……..:shock::shock::shock::shock:

Isn't there a song from the Bond movie "Live and Let Die" that goes something like - "in the ever changing world in which we're living" ………………..:roll::roll:

Where does "Marabost" come from and are you going to be able to either, hinge the boards upwards or reach that rear siding from the front when all the others are full ?  That last siding is the one where ALL the derailments will take place !!!!   In fact, you could call it "Murphy's Siding" ;-)

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#159007
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Didn't take too long to do Peter.
The name Marabost is derived from my operating crews names.

The bottom rear siding is in fact the main line & over the last few years, never had a derailment due to careful track laying & making sure all rolling stock is close to AAA in back to backs, etc. Planning to have the station to be lifted off if needed.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#159011
Avatar
Full Member
Thanks Sol :thumbs

It does look good.

Back to my plasterboarding now - at 32C in the shade !!!!!! :???:

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#159017
Avatar
Full Member
How the heck do you know what to do with which, Sol?

I admire your seeming efforts to cover a small portion of Terra Australis Incognito with Peco Semi Cognito….


Yes, Peter, it is bloomin' hot 32 here as well and me sanding the terrace wood-work. In the middle of re-gluing a 1/76th door knocker to a door with S'glue a drip of perspiration landed smack on target and washed it away…and, for the second time in my life I superglued the starboard arm of my spectacles to my lug'ole.

Keep at it Sol,

Doug

'You may share the labours of the great, but you will not share the spoil…'  Aesop's Fables

"Beer is proof that God loves us and wants us to be happy" - Benjamin Franklin


In the land of the slap-dash and implausible, mediocrity is king
Online now: No Back to the top

Post

Posted
Rating:
#159050
Legacy Member
Wow Ron . You have made some major changes while my back was turned. :thumbs

reg
Online now: No Back to the top

Post

Posted
Rating:
#159351
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
and this is the plan.


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#159352
Avatar
Full Member
Nice… That'll keep 'em busy.

Marty

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#159464
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Track laying has started



Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#159475
Avatar
Full Member
From my point of view it's encouraging to see someone else at the same stage as me Ron. Too many changes of plan is my problem. Lost count the number of times I've had the layout planned and then changed my mind. I'll get there one day, I think. ;-)

:hmm

Barney

Always try to look on the bright side of life!

Barney
Online now: No Back to the top

Post

Posted
Rating:
#159488
Avatar
Full Member
Ron has the input from several operators who wish for things to be different… And he delivers.

It would drive me crazy, but that's how we are all different.

…. And having said that there is a section on NE that I am planning to rip up and relay….:roll:

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#159494
Avatar
Full Member
Looking good Ron. 

:thumbs :thumbs

Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Online now: No Back to the top

Post

Posted
Rating:
#159540
Avatar
Full Member
Wow! Lots of work there, Ron.

http://dddioramas.webs.com/

11 + 2 = 12 + 1
Online now: No Back to the top

Post

Posted
Rating:
#160347
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
All track down & wiring underway

looking both ways:
 







The station throat, etc




The panel - toggles for solenoid motors using the "one-Wire" method
 http://yourmodelrailway.net/view_topic.php?id=10221&forum_id=6&jump_to=191438#p191397

 





Last edit: by Sol


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#160394
Avatar
Full Member
Did the test running on the track go smoothly, Ron?

http://dddioramas.webs.com/

11 + 2 = 12 + 1
Online now: No Back to the top

Post

Posted
Rating:
#160399
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Pete, no actual real test running yet, wiring to be finalised next week


all the droppers in so I will have to lift t his off & turn it upside down to finish it all.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#160400
Avatar
Full Member
Crikey! Good luck with that.

http://dddioramas.webs.com/

11 + 2 = 12 + 1
Online now: No Back to the top

Post

Posted
Rating:
#160408
Ken
Avatar
Inactive Member
I really like that plan Sol and the tracklaying etc looks great - I think you should change your name to Speedy Gonzales!!! :lol:

Ken

'It don't mean a thing if it ain't got that Swing'
Online now: No Back to the top

Post

Posted
Rating:
#160733
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
All wired up now & working a treat.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top
1 guest and 0 members have just viewed this.