Watchit

Post

Posted
Rating:
#202190
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’

Small station on the Devan & Summersett

I don't think I have any photos on YMR about the brewery - just Metcalfe dumped in a location - to be sited properly & sceniced in the fullness of time when I get to Tawnton..

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#202319
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
The plan with balsa added for the walls to attach to..


the back wall added…


and its location…


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#202379
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
another wall done - top RH corner problem now fixed.


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#202382
Avatar
Full Member
Charging along with the build Sol, 
I like the overhang.

cheers
Marty

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#202425
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
the other end wall - not so easily viewed


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#202430
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
platform done - concrete slab


now for the front walls….

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#202432
Online now: No Back to the top

Post

Posted
Rating:
#202434
Avatar
Legacy Member
going to be a good addition to the site,looks brill
:thumbs;-):cool:

my webcam link 6.19.184.67:8080
Online now: No Back to the top

Post

Posted
Rating:
#202435
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
The roof will be the hardest part to do....

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#202500
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
front walls done



high level view to show the walls angles


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#202501
Ed
Avatar
Site staff
Ed is in the usergroup ‘Super-moderators’
Meant to ask what sort of roof your putting on Sol.


Ed

Online now: No Back to the top

Post

Posted
Rating:
#202502
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Ed, galvanised iron & it will be "fun" to do

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#202503
Avatar
Full Member
indeed it will, good luck with that!


Marty

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#202504
Ed
Avatar
Site staff
Ed is in the usergroup ‘Super-moderators’
Is that the old corrugated cardboard trick Sol, or have you another version.


Ed

Online now: No Back to the top

Post

Posted
Rating:
#202508
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Yes Ed, corrugated card.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#202512
Ed
Avatar
Site staff
Ed is in the usergroup ‘Super-moderators’
It's a bit of an odd shape, so I'll echo what Marty said and wish you good luck :thumbs


Ed

Online now: No Back to the top

Post

Posted
Rating:
#202588
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
wall capping done plus a downpipe


another downpipe required at this end - I reckon I may need a brick/concrete pillar right at the end of the platform to give "support" to the upper level concrete slab ??

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#202591
Avatar
Banned
Looks good Sol. :thumbs

I'd go for a vertical piece of H section (styrene) to act as the support brace. Throw on some yellow/black diagonal lines. some rust and you're done… Well, apart from the roof that is ! ;-)

Cheers, Gary.
Online now: No Back to the top

Post

Posted
Rating:
#202599
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Thanks Gary - steps to go in & the building weathered when in situ properly


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#202635
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Thin wood used for roof timbers on a balsa main beam


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top
1 guest and 0 members have just viewed this.