Barnstable

Post

Posted
Rating:
#252707
Avatar
Full Member

One station of the Devan & Summersett

Hi Sol - another fine piece of work - but what were the operational changes?  It looks as though there is no longer track adjacent to the platform, so is that changing too?
I've made minor changes to my track, before any scenery was in place, but you always make it look effortless.  It would fill me with a little dread!

Michael


Online now: No Back to the top

Post

Posted
Rating:
#252708
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Michael, having that slip meant I couldn't run trains in/out Marabost & Watchit at the same time & yes the track next to platform has gone - actually just the rails.

I have other changes at the other end of the layout to take up recently laid ballasted track & turnouts to also make it easier for the main Signal man - me - replace 5 turnouts with one diamond.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top
1 guest and 0 members have just viewed this.