0 gauge buildings
Posted
#225746
(In Topic #12313)
Full Member
Harts Hill Iron works currently under construction for my 0 gauge "The Wallows" layout. Built from 2mm Lite ply with PlastiCard overlays, still lots to do.
'Twor Mee Iday Doit' (Black Country Latin)
Posted
Full Member
Freehand or from a plan ?
I'm intrigued by your username - Jelicoe (with 2 "L's"), was synonymous with the Battle of Jutland but that was in 1916. Why Jelicoe 1914 ?
'Petermac
Posted
Full Member
I'm sure there's a story behind your screen name.
John
John
Posted
Legacy Member
Allan
Posted
Inactive Member
As an O scale scratch builder myself, I also would like to see some of your tricks. :cool:
Max
Port Elderley
Port Elderley
Posted
Full Member
User name is from my Fathers middle name and he was born in 1914. No plan just an idea and drawn straight onto the ply. Beats back of an envelope ;-)Very nice Mike. :thumbs
Freehand or from a plan ?
I'm intrigued by your username - Jelicoe (with 2 "L's"), was synonymous with the Battle of Jutland but that was in 1916. Why Jelicoe 1914 ?
'Twor Mee Iday Doit' (Black Country Latin)
Posted
Full Member
Noviceman
Posted
Full Member
and finally in place on my Primrose Hill Micro.
'Twor Mee Iday Doit' (Black Country Latin)
1 guest and 0 members have just viewed this.