Improving Metcalfe kits
Posted
#24940
(In Topic #1788)
Guest user
A number of things had been done a signifiacant thing was changing the roofs from card to plasticard.
Things like the water tower had been changed to plasticard as well plus details like pipework between buildings had been added
The boiler house aswell had been changed and a actual boiler was visible inside the building
Plus all the buildings had been weathered which vastly improved ther overall appearance.
So with alittle efort a basic card kit can be made to look very good indeed.
heres a couple of piccys
cheers Brian.W
Posted
Guest user
As you know, I did some improvements to my brewery buildings when I built mine, but restricted myself to gutters and downpipes, painting the fold/score lines and some light weathering. I was tempted to go further, but in the end left the improvements as shown, as the site is at the back of the layout, so enough was enough.
I intend to use some Metcalf kits for more prominent structures and I'll certainly be doing more with those, but it seems that there's so much lined up for me at club level that the WVR is taking a bit of a back seat at the moment :exclam
1 guest and 0 members have just viewed this.