Watchit

Post

Posted
Rating:
#254038
Full Member

Small station on the Devan & Summersett

I like that Ron. What'll happen to the point at the far end of the platform?

Cheers Pete.
Online now: No Back to the top

Post

Posted
Rating:
#254040
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
PeterM - a lot of thinking/trying out to do

as of now


Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#254045
Avatar
Full Member
Wow Sol - you moving tracks - that must be a first ………………….. :mutley :mutley

Actually, looking at that last photo, you've gained quite a lot of track space without losing much on the road side.

I have to ask - why do you need the extra tracks - is it for storage or are you rescheduling all your timetables ?

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#254071
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Peter, rescheduling of timetable means I will have a goods train arrive followed by a passenger that needs to have the loco run-around well before the goods train has been shunted especially if there are 12 or so wagons to go all over. Watchit does have 8 locations for wagons, etc to be set out / picked up from.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#254079
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Watchit right hand end before & after plan




Left hand end before & after plan




Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#254080
Full Member
Nice one Ron.

Cheers Pete.
Online now: No Back to the top

Post

Posted
Rating:
#254084
Avatar
Full Member
Is that diamond electrofrog Sol ?  

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#254087
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
I was given an Insulfrog version tonight - that will make wiring life easier.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#254534
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
One end almost finished but the turnout works at least…


it was "fun" joining Peco Code 75 to handlaid Code 83 and having to take into account different sleeper thickness.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#254548
Full Member
More work for the poor old signalman. Looks good so far though Ron. Code 75 to 83 eh… lots of fun.


Cheers Pete.
Online now: No Back to the top

Post

Posted
Rating:
#254551
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Yes Pete, I find it easier to join 75 to 100.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#254973
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
The other end now re-tracked with wiring & solenoids to follow…


platform ends to be modified in the fullness of time

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#254977
Full Member
I like the idea of what you've done. It'll be impossible to pick once you've finished.

Cheers Pete.
Online now: No Back to the top

Post

Posted
Rating:
#255099
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Fully working now & ballasted ( new ballast of course)





when the platform is modified, then ballast on that side will be finished properly

but before  that happens, track work at Tawnton & Charde to be undertaken. ( plus some reasonably massive changes in the timetables, etc as well - the crew are finding things for me to do )

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#255100
Full Member
Just like the real thing, always something to do. I was on the pway just outside Clapham Jct and every dat we'd jack a piece of track and tamp ballast with shovels… hard work.

Cheers Pete.
Online now: No Back to the top

Post

Posted
Rating:
#255102
Avatar
Full Member
Good to see that they are keeping you busy Ron. Nice relay.

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#255103
Avatar
Full Member
Looks very neat Sol - what do you do re ballast around the point tie-bars ?

Sometimes, I think I need a "crew" to stop me being a butterfly …………………… :roll:  I've got more "work in progress" jobs than I've had hot dinners ………

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#255108
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Peter. carefully paint full strength PVA & pad ballast into it - when dry , vacuum up the reminder.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#255109
Avatar
Full Member
Thanks Sol - isn't there a big risk that the tie bar will get glued ?

 I tend to leave the area immediately around the tie bar clear of ballast but it then sticks out like a sore thumb so am always interested in how others manage………………. :hmm

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#255112
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Not if one puts a couple drops of oil around the tiebar itself.

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top
1 guest and 0 members have just viewed this.