At last

Post

Posted
Rating:
#266040 (In Topic #14487)
Full Member

Track laid and working.

Some of you will remember my thread on Wadebridge. I started it on 11th of July last year! I can't believe it's taken me that long.

Well the track has been down for some time, but I've had a few stumbling blocks along the way with wiring rotary switches for double slips and storage yard points, also with rotary switches.

With helpful advice for those rotary switches, it's all done. I'm going to thoroughly test it all before filling sleeper gaps and starting on the scenery. Despite having two ceiling fans in the garage, it's just too hot and sticky to spend much time out there, so mornings are the order of the day as the garage has a westerly aspect.

I hope to be able to make more progress now that I'll be standing up rather than sitting underneath it all.

My wife has been bloody marvellous while I've spent so much time out there, with not one complaint. Thanks love.

Cheers Pete.
Online now: No Back to the top
1 guest and 0 members have just viewed this.