A new station on the D and S
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/1338.jpg)
Site staff
![Ed is in the usergroup ‘Super-moderators’ Ed is in the usergroup ‘Super-moderators’](https://yourmodelrailway.net//themes/default/images/cns_rank_images/mod.png)
Ed
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/606.jpg)
Site staff
![Sol is in the usergroup ‘Super-moderators’ Sol is in the usergroup ‘Super-moderators’](https://yourmodelrailway.net//themes/default/images/cns_rank_images/mod.png)
As it is now - the two tracks on the right hand side all relate to another station Watchit….
![](https://yourmodelrailway.net/gallery/606/606_191642_320000000.jpg)
![](https://yourmodelrailway.net/gallery/606/606_191642_570000000.jpg)
As the main platform is not long enough for a 4 coach train plus loco, there will be some changes.
The wall that separates the platform from the track with the distant DMU comes down, that DMU track will be re-worked back into Marabost and the wall rebuilt to separate the right hand track that serves another station; main platform will be extended and a small bay for parcels, etc .
So over the next few weeks ( after I have installed a replacement control panel), I will have photos of demolition & rebuild.
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/2137.jpg)
Legacy Member
Brian
OO gauge DCC ECOS Itrain 4 computer control system
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/1512.jpg)
Full Member
Regards
Michael
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/606.jpg)
Site staff
![Sol is in the usergroup ‘Super-moderators’ Sol is in the usergroup ‘Super-moderators’](https://yourmodelrailway.net//themes/default/images/cns_rank_images/mod.png)
![](https://yourmodelrailway.net/gallery/606/606_192118_340000000.jpg)
![](https://yourmodelrailway.net/gallery/606/606_192118_550000000.jpg)
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/2137.jpg)
Legacy Member
Brian
OO gauge DCC ECOS Itrain 4 computer control system
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/606.jpg)
Site staff
![Sol is in the usergroup ‘Super-moderators’ Sol is in the usergroup ‘Super-moderators’](https://yourmodelrailway.net//themes/default/images/cns_rank_images/mod.png)
![](https://yourmodelrailway.net/gallery/606/606_201700_430000000.jpg)
the bottom LH arrow is what goes across the liftup
![](https://yourmodelrailway.net/gallery/606/606_201701_370000000.jpg)
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/6.jpg)
Full Member
I love this photo Sol :
![](https://yourmodelrailway.net/gallery/606/606_191642_320000000.jpg)
Presumably, the idea is that the left hand "Watchet" track will become a platform track on Marabost thus giving a full length platform face rather than the existing 2 bays which effectively cut the length in half………….. :hmm
Knowing how you work, I'll look forward to seeing the finished altertions in about 20 minutes ………………………..
![:lol:](https://yourmodelrailway.net//themes/default/images_custom/lol.gif)
![:lol:](https://yourmodelrailway.net//themes/default/images_custom/lol.gif)
'Petermac
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/606.jpg)
Site staff
![Sol is in the usergroup ‘Super-moderators’ Sol is in the usergroup ‘Super-moderators’](https://yourmodelrailway.net//themes/default/images/cns_rank_images/mod.png)
I will take photos as I demolish & rebuild.
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/6.jpg)
Full Member
![:mutley](https://yourmodelrailway.net//themes/default/images_custom/cns_emoticons/staff_muttley.gif)
In the meantime, we'll enjoy the stills of the demolition and rebuild ………….. :thumbs
'Petermac
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/434.jpg)
Full Member
Best wishes
John
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/19.jpg)
Full Member
The current two tracks associated with Watchit are storage tracks aren’t they. Does the reduction in storage space mean a reduction in traffic to Watchit or a rearrangement of the timetable to suit the reduced space.
Nice to see the greenery and buildings too.
Looking forward to the updates.
All the best
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/606.jpg)
Site staff
![Sol is in the usergroup ‘Super-moderators’ Sol is in the usergroup ‘Super-moderators’](https://yourmodelrailway.net//themes/default/images/cns_rank_images/mod.png)
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/606.jpg)
Site staff
![Sol is in the usergroup ‘Super-moderators’ Sol is in the usergroup ‘Super-moderators’](https://yourmodelrailway.net//themes/default/images/cns_rank_images/mod.png)
Before
![](https://yourmodelrailway.net/gallery/606/606_072253_400000000.jpg)
the wall has gone & hopefully can be reused.
![](https://yourmodelrailway.net/gallery/606/606_072254_130000000.jpg)
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/606.jpg)
Site staff
![Sol is in the usergroup ‘Super-moderators’ Sol is in the usergroup ‘Super-moderators’](https://yourmodelrailway.net//themes/default/images/cns_rank_images/mod.png)
![](https://yourmodelrailway.net/gallery/606/606_072322_190000000.jpg)
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/1916.jpg)
Full Member
Last edit: by ZeldaTheSwordsman
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/6.jpg)
Full Member
This photo suggests this isn't the first time there have been major alterations here ……………………..I can see the outline of previous track work under where the bay platform sat…………… :roll: As I said, more photos please !!!
![](https://yourmodelrailway.net/gallery/606/606_072322_190000000.jpg)
'Petermac
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/606.jpg)
Site staff
![Sol is in the usergroup ‘Super-moderators’ Sol is in the usergroup ‘Super-moderators’](https://yourmodelrailway.net//themes/default/images/cns_rank_images/mod.png)
![](https://yourmodelrailway.net/gallery/606/606_080358_340000000.jpg)
![](https://yourmodelrailway.net/gallery/606/606_080359_240000000.jpg)
and yes Peter, there have been many changes on that part of the baseboard….
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/2137.jpg)
Legacy Member
Brian
OO gauge DCC ECOS Itrain 4 computer control system
Posted
![Avatar](https://yourmodelrailway.net//uploads/cns_avatars/606.jpg)
Site staff
![Sol is in the usergroup ‘Super-moderators’ Sol is in the usergroup ‘Super-moderators’](https://yourmodelrailway.net//themes/default/images/cns_rank_images/mod.png)
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
1 guest and 0 members have just viewed this.