Waddlemarsh
Posted
Full Member
Somewhere SW of London. Somewhen before today
The conductor rails are fully laid but will remain dummy. Different tolerances between manufacturers make it impractical to power trains from the "juice" rail though electrically it is quite simple. All the Ratio platform lamps are fitted and await full wiring but have been tested on a battery and confirmed as working. Which is good news considering the amount of work involved with them. The "target" station name signs are missing somewhere in my bits boxes; I have the stick-on vinyl names but not (yet) the brass-etch brackets. I know they're there somewhere. The platforms were nice and level a month ago. Then the hot weather caused them to pop up off the supports once again and currently they still need re-settling. On-screen enlargements of the images show up paint touch-up required in many places and weathering of new ballast patches. But it's definitely getting there.
Posted
Posted
Full Member
Gwiwer said
The conductor rails are fully laid but will remain dummy. Different tolerances between manufacturers make it impractical to power trains from the "juice" rail though electrically it is quite simple. All the Ratio platform lamps are fitted and await full wiring but have been tested on a battery and confirmed as working. Which is good news considering the amount of work involved with them. The "target" station name signs are missing somewhere in my bits boxes; I have the stick-on vinyl names but not (yet) the brass-etch brackets. I know they're there somewhere. The platforms were nice and level a month ago. Then the hot weather caused them to pop up off the supports once again and currently they still need re-settling. On-screen enlargements of the images show up paint touch-up required in many places and weathering of new ballast patches. But it's definitely getting there.
From “Post #293,665”, 9th September 2026, 7:04 am
A shame about the juice rail not being suitable for pick ups. That could give more reliable running like a three rail track.
Cheers Pete.
Posted
Full Member
The backscene has been extended into the visible run-off area of the twin “electric” sidings.
All four electrical circuits are now wired and working although not all as reliably as they should due to irregularities in the track and some dirt spots.
The 4TC unit was worked by E6104 today while a 2BIL unit forms the local service. A class 73 takes a short ballast train, the class 03 shunter is dealing with milk tankers and the small yellow “departmental” has placed the Mike Romans* commemorative coal wagon for unloading on the Merchant’s Siding. This wagon has been filled with “Woodland Scenics” coal and weathered
* Not all of us here knew Mike. He was a true gentleman, former WR railwayman in many roles and was never afraid to share his vast knowledge. Kernow MRC has released two commemorative wagons (the other being a milk tanker branded for Mike’s Porth Emmett layout location.
Posted
Full Member
peterm said
Gwiwer said
The conductor rails are fully laid but will remain dummy. Different tolerances between manufacturers make it impractical to power trains from the "juice" rail though electrically it is quite simple. All the Ratio platform lamps are fitted and await full wiring but have been tested on a battery and confirmed as working. Which is good news considering the amount of work involved with them. The "target" station name signs are missing somewhere in my bits boxes; I have the stick-on vinyl names but not (yet) the brass-etch brackets. I know they're there somewhere. The platforms were nice and level a month ago. Then the hot weather caused them to pop up off the supports once again and currently they still need re-settling. On-screen enlargements of the images show up paint touch-up required in many places and weathering of new ballast patches. But it's definitely getting there.
From “Post #293,665”, 8th September 2026, 10:04 pm
A shame about the juice rail not being suitable for pick ups. That could give more reliable running like a three rail track.
From “Post #293,690”, 18th September 2026, 12:08 am
It is technically possible.
At one stage around 15 years ago I actively looked into it. The challenges are significant.
The conductor rail must be laid perfectly level and precisely aligned to the running rails; not that hard.
The pick-up shoes on the stock have to be adapted to collect current or replaced with something looking like a shoe which will collect current. The underside needs to be very precise for height to ensure good contact without undue friction; to achieve this I looked into building sprung shoe-beams as sprung shoes would be too small to build without specialist kit. I also trialled stick-on copper sheet beneath the shoes. Extremely difficult.
Manufacturers use different tolerances resulting in the pick-up shoes of Hornby, Bachmann and Dapol all being at different heights and at significantly different distances outboard of the frames. In particular the Hornby units would require major surgery to match the more accurate Bachmann ones; very difficult.
“Slop”, play, sideways (or lateral) movement, the “give” which must be there to allow free and reliable running of the rolling stock, varies but can be 1 - 2mm and occasionally more. With the head of the conductor rail being 1.25mm wide the inbuilt play would mean frequent loss of contact as the shoes moved to one side or the other of the conductor rail. They could also become trapped behind the rail leading to damage and derailments. Even if the second running rail were also in use for current this is a near-insuperable problem unless grossly over-sized pick-up shoes were used.
Then there’s the wiring. The conductor rail changes sides but the polarity must remain the same. So the pick-ups on both sides of the train must be connected to the same side of the motor. Assuming a system similar to the prototype the conductor rail is the negative (feed) side, the running rail the positive (or return) and the second running rail, if bonded to the pick-ups, would also be negative and probably the only means of DCC operation; quite difficult becoming very difficult if you don’t have a well-equipped micro-engineering set-up.
In the end and despite knowing of a very small number of successful third-rail powered layouts I reverted to dummy mode.
Last edit: by Gwiwer
Posted
Full Member
Cheers Pete.
Posted
Full Member
- Darius
Posted
Full Member
Cheers Pete.
Posted
Full Member
The “target” station name signs have been restored. The conductor rails have received the first coat of black paint. The Up platform has had some remedial work done to various dips and bumps; the Down platform awaits the same treatment.
Posted
Full Member
The blue Bachmann 2-EPB unit has its shoes almost perfectly positioned. Or I have managed to fix the conductor rail in the ideal location. You decide!
The green Hornby 2-BIL unit has its shoes visibly outboard of the conductor rail by around 1.5mm.
Posted
Full Member
I haven't been able to access this site for quite some time and was on the point of giving it up completely when I finally got back in today.Visible progress at Waddlemarsh remains minimal since at this stage most of the work is wiring and small sceninc tweaks. Those tweaks do end up adding to the overall scene but the key issue is that I need the entire layout to WORK. Most of it does. Some of it isn't wired yet so will not work. One or two spots have annoying backfeeds which I'm sure must come from the crossover modules I had built. The double-slip isn't wired yet so it won't be from that.
Some isolated track sections need to be put in as well which will be by means of a rail-break controlled by a push-to-make button. That will allow shunting moves on a DC layout without everything moving at once.
The rails have been "rusted" over most of the layout; a re-stock of Railmatch "Rust" is awaited to complete the job.
Posted
Full Member
Cheers Pete.
Posted
Site staff

Posted
Full Member
Cheers Pete.
Posted
Site staff

peterm said
Mine is stalled at the moment. The cancer's gone to my spine now. One of the three of is pressing on the L1 vertebrae and I have to say it's not much fun. Having a course of radiation so hopefully I'll be getting back to it. I'm itching to get stuck in but…
From “Post #293,763”, 19th November 2026, 12:23 am
Best of luck Pete, hope it goes well.
Ed
Posted
Full Member
peterm said
Mine is stalled at the moment. The cancer's gone to my spine now. One of the three of is pressing on the L1 vertebrae and I have to say it's not much fun. Having a course of radiation so hopefully I'll be getting back to it. I'm itching to get stuck in but…
From “Post #293,763”, 19th November 2026, 12:23 am
All the best from here. I know radiation works. It fixed it for me.
Posted
Full Member
Cheers Pete.
Posted
Full Member
John.
Posted
Full Member
Cheers Pete.
Posted
Full Member
The rain started around 2am. By 3am it was hammering on the skylights like marbles flung from on high.
The result? Over 66mm of rain in 24 hours and most roads flooded and / or covered in washout debris.
It’s been a lot better today but still with a lot of run-off so I stayed home.
And got on with the latest iteration of the bridge deck. The Belisha beacons actually flash and are set to be out of synch. The street lights need dimming but that should be easy. Wiring more lights in series will do the job.
The white-line kit and traffic are in the club room. Next visit should see this fitted once more and this time the deck will be removable not fixed. There are points underneath and tracks to clean. Lesson learned
1 guest and 0 members have just viewed this.
