N Gauge - Newcastle Emlyn****

Post

Posted
Rating:
#56480
Avatar
Full Member
Thanks Ken,

Good luck with the gig.

Looking forward to further developments from Okehampton. The quarry was coming along champion last time we saw it.

Always plenty of help with electrics on here too.

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#56492
Avatar
Full Member
Great progress with that control panel Marty.Looking VERY professional! Its going to be great to watch this all taking shape scenically knowing what you're capable of.I can't wait!!!;-)

Cheers,John.B.:thumbs
Online now: No Back to the top

Post

Posted
Rating:
#56544
Guest user
I love it Marty.  How did you do the signalling panel?  Is it some sort of print out?
Back to the top

Post

Posted
Rating:
#56576
Avatar
Full Member
[user=201]georgejacksongenius[/user] wrote:
Great progress with that control panel Marty.Looking VERY professional! Its going to be great to watch this all taking shape scenically knowing what you're capable of.I can't wait!!!;-)

Cheers,John.B.:thumbs
Neither can I John but I'm having fun with the electrickery so it's not all bad.

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#56577
Avatar
Full Member
[user=200]Christrerise[/user] wrote:
I love it Marty.  How did you do the signalling panel?  Is it some sort of print out?
Yes Chris, drawn up in Microsoft Powerpoint and then printed to scale 1:1 on A3.
Eventually, when I'm happy I've got it close to right, it will be laminated and held in place with double sided sticky tape in the corners or varnished onto the wood.

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#56580
Guest user
That is great Marty, although I still don't know how you did it!  Whenever I try drawing anything like that it just comes out shaky and a mess!
Back to the top

Post

Posted
Rating:
#56583
Avatar
Full Member
Drawing pictures in Power point is a bit of a speciality of mine as a Draftsman/Cartographer.

Too start with you need the DRAW palette open from the TOOLS menu (I think).
That is where all the lines and shapes are.

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#56836
Avatar
Full Member
Henllan Control Panel
Improvising a mounting panel for Peco switches.

The original plan was to use the Peco mounting block for the switches and the wooden framework was built, months ago, accordingly.
But, to give a bit more flexibility in operating the Henllan station layout a couple more isolation sections have been added .
This meant that instead of 16 switches, there were now 18 and the Peco mounting blocks wouldn't fit inside my framework.
Loath to break up the wooden framework an alternative mounting for the Peco switches was looked for.

After about 20 mins of searching around the layout room and shed for something suitable a couple of old, donated to the cause, baking trays came to light.
It might just do the trick.

Careful measuring of the Peco switch, some calculations, some measured twice marking up and then some slow but steady work with the cutting disk on the Dremel motor tool and this might just work…





Cut to size and a bit of panel beating…





Spray paint gloss black, do something else for 16+ hours while it dries and then fit…





Its not perfect, the mounting slot should have been done in maybe 3 sections with narrow strips left between each section to help the slot maintain its shape. There is some flex in the metal and the switches fall through the gap in the middle.

Still, once the remaining switches required are purchased some Superglue should do the trick.





The 5 Blue/White switches on the right are wired up to isolate the sections of the yard (A, B & C), goods loop (D) and Henlland Down line (E) and have been tested.
This is a big leap ahead for me.
Up to 7 locos can now be managed in the Henllan Station layout. Only one at a time at this stage but the operating potential of the layout has just been increased dramatically.

Obviously a fair amount of testing was required last night :doublethumb

 



Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#56838
Sol
Guest user
Well, no end to this mans' ingenuity:exclam  :doublethumb
Back to the top

Post

Posted
Rating:
#56851
Guest user
the work of a dedicated tighta**se,brill,
looks ok Marty.

:doublethumb:mutley:mutley:cool:
Back to the top

Post

Posted
Rating:
#56864
Guest user
Well done Marty that is the way to produce something unique

As you used the baking tray i cant resist this "Now your really cooking on gas"

cheers Brian
Back to the top

Post

Posted
Rating:
#56906
Guest user
That's really brilliant Marty, a super idea.  Another one filed away for future reference ;-)
Back to the top

Post

Posted
Rating:
#56946
Guest user
That is a bit of genius Marty, but imagine the scene around the country next weekend as our dearly beloveds start to prepare the Sunday roast:shock:
:lol:
Back to the top

Post

Posted
Rating:
#56988
Avatar
Full Member
Great idea Marty, I just hope the Mrs isn't looking under everything for that tray! Though I doubt if she'd recognize it!

Wayne

My Layout "The South Shore Line":
http://yourmodelrailway.net/view_topic.php?id=509&forum_id=21
This video/animation was made in Adobe Flash Player, which is no longer supported or available for download.
Online now: No Back to the top

Post

Posted
Rating:
#56990
Avatar
Full Member
[user=22]Wayne Williams[/user] wrote:
Great idea Marty, I just hope the Mrs isn't looking under everything for that tray! Though I doubt if she'd recognize it!

Wayne

It's OK lads, I'm safe, the tray, and 3 others, were surplus to requirements and rather than be thrown away were donated to the railway some time ago.

So I've got plenty of options for further control panels :thumbs ;-)

Besides, seconding a "current" baking tray from Tracy's kitchen for model railway purposes…. sorry, I like living :chicken

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#57011
Guest user
Very very smart control panel Marty :thumbs
Back to the top

Post

Posted
Rating:
#57044
Guest user
well done marty, :thumbs
Back to the top

Post

Posted
Rating:
#57099
Guest user
Very smart indeed! It sure beats my grotty old setup.

Mike
Back to the top

Post

Posted
Rating:
#57921
Avatar
Full Member
:doublethumb Love the control panel …. Cool!

Life is just a bowl of cherries!
Online now: No Back to the top

Post

Posted
Rating:
#57922
Avatar
Inactive Member
Yes, it did stretch a bit with the heat from the Dremel, but like you say, once the switches are glued in, it will all sit right.  Nice one, Marty :thumbs
Online now: No Back to the top
1 guest and 0 members have just viewed this.