00 Gauge - Jeff Lynn / SRman's New Layout
Posted
Full Member
Progress (or otherwise) on Jeff's new layout
Moving along the line a little (literally), I have done a little reseating and filling on the Wills stone viaduct section. The last arch in particular wasn't sitting properly, but is now much better. The filler is still in its raw, unfinished state - it has to harden properly before I attempt to sculpt it to match the stone courses.After this, I'll be able to paint it properly (the existing paint was really just a rough wash to reduce the visual impact of the light grey plastic. I can't glue it into place yet as I still need easy access to the tracks behind to lay the third and fourth rails.

Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Banned
With the steel girder bridge in post 453, you could possibly add extra cantiilever supports that dissapear into the brick retaining wall, like this…
Cheers, Gary.
Posted
Full Member
Phil
Phil
Posted
Full Member
Hi Gary. Once again, I'm thinking along the same lines, although I also have an alternative in mind. That would be to add the extra girders as you have indicated, but extended over to the platform with vertical supports going down to the platform (or realistically, extending up from the platform!). That might also involve the first girder. There are plenty of examples of that sort of structure in the real world of railways and would get over the feeling that the girders are just suspended in mid-air.The arched bridge looks very good, but will only look better when finished ! :thumbs
With the steel girder bridge in post 453, you could possibly add extra cantiilever supports that dissapear into the brick retaining wall, like this…
![]()
Cheers, Gary.
p.s. Nice art work on my photo! :)
Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Full Member
https://www.youtube.com/watch?v=LfbZmNL0UPk&ab_channel=JeffreyLynn with a Heljan class 33 and legomanbiffo sound;
https://www.youtube.com/watch?v=LkyQVXfwFe8&ab_channel=JeffreyLynn with a Bachmann class 37 and Howes sound;
https://www.youtube.com/watch?v=EoBWJiy4XKc&ab_channel=JeffreyLynn with a Heljan class 52 and Howes sound.
I am learning as I go and trying to put more features to make them more watchable and interesting, as well as using different locos to give a variety of sounds. I hope to improve as I try a few more of these videos.
Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Legacy Member
:thumbs;-):cool:
Owen
web-cam 2.2.74.174:8081
if the lights are off no cam
if the lights are off no cam
Posted
Full Member
https://www.youtube.co…L4&ab_channel=JeffreyLynn
Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Full Member
A Motor Luggage Van (MLV) of class 419 in plain BR blue with full yellow ends (fye) from Invicta Models (by Bachmann). 68004 is seen here leading 68006 in green, with green 4 CEP (class 411) unit 7126 just off-stage. This has been fitted with a Lenz decoder to match all my other 4 CEP, 2 EPB and MLV units. Standardising on these makes for easier matching up of settings for multiple operation (consists in DCC parlance). Kadee #19 couplings were fitted to each end.

Not a good photo, but this is a three car BR Mark 1 "suburban" non-gangwayed set from Replica Railways parts. The body shells come pre-painted but without numbering. This set is still awaiting numbering, window 'stickers', set numbers and underframe detail components to be fitted. I ordered one more complete kit so I could adapt the body to fit a spare Bachmann 4 CEP TS underframe to convert a Kernow green 2H DEMU to a 3H unit. This conversion is still in progress and also requires the green to be darkened a little and the roof ridges to be removed. The 4 CEP chassis allows for the interior lighting and head and tail light connections to be continued through the unit. In the meantime, I have other plans for the remainder of the 4 CEP (3 CEP now!) and the remaining Replica chassis. I'll try to post some detail shots of these in my workbench thread later.

I have ordered two of the bargain Hornby 2 HAL (class 402) units from Hattons. One, 2603 in green with fye has already arrived and been fitted with a Lenz decoder and Kadee #19 end couplings to match with all my other 2 HAL and 2 BIL units. A blue unit also with fye is still to arrive.

I also succumbed to temptation and bought a Network South East 2H (class 205) unit from Rails of Sheffield. These were commissioned from Bachmann by Kernow Model Rail Centre. Unit 205 001 is seen on its own and running in multiple (consist) with a previous purchase from Kernow, unit 205 012 in Connex livery. Again, Lenz decoders and Kadee #19 couplings are fitted, although I may have to go to the longer #20 couplings for tighter curves (only tested on the outer run for now).


Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Full Member
I'm using the strips of surface-mount LEDs that can be purchased quite cheaply from eBay sellers, which are arranged in sets of three LEDs with a resistor included in each set to allow for direct wiring up to 12 Volts DC. I tested one group of three sets of three on DCC wired straight to the track and that worked fine, so proceeded to wire up the first two cars of my six-car S Stock. The Driving Motor cars are easier as they already have a PCB feeding from the bogie pickups, but Bachmann have been very kind to us in fitting pickups to all of the trailer coach bogies as well - wiring the lights involves more wire and soldering than the DM but is still relatively easy.
The lights are very bright, so I may look at ways to dim them a little (especially if I want to light the BILs and HALs!), but I'd say the experiment has been a success, so I have four more cars to wire up in the near future. I have posed an unlit car beside the two with lights for comparison.



Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Full Member
Last edit: by SRman
Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Full Member

This now allows me to screw down the adjacent board, which is already cut to the correct shape and fit, which, in turn, allows me to start more track laying.
As a preliminary to the laying of further track, I have placed a few lengths of rail and posed a 9-car unit as being the maximum allowed length: 2 x 4 CEP units and an MLV were loose coupled to gauge where the end of the loop is needed (with a little leeway built in) and where the next lot of points will go.
There is, as always, still much to do (that's almost become my mantra!), but it feels like a new start on progress after a period of stagnation.
Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Full Member
What I have done is cut and fit the track along the front of the layout, on the bridges and viaducts. It is not fully laid as it is not fixed down in any way, yet, a job that has to await my finishing the bridges and viaducts and also completing the third and fourth rail laying on the lower level (the viaducts get in the way of this).
Anyway, here are a couple of photos to show how the alignment will look when finished. The curve under the 2 HAP unit (the unpainted resin kit at top left) is a set track 3rd radius item. If I can ease this out a little I will do so.

Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Full Member
Posted
Full Member
Sorry to hear about the Siatica, hope it clears up quickly. Laying the track on the viaduct really shows where you are going with this layout and I'm particularly taken by the view along the lower level in between the high level showing the cross overs and the third rail work that you have done there. Your steady progress is paying off.
Keep it up.
Marty
Last edit: by Marty
Posted
Full Member
I subscribe to what I teach about project management: break the big job down into smaller, "digestible" chunks. In the case of our hobby, doing a little at a time still eventually gets the job done, and one can pick and choose which bits one feels like doing at any given time, unlike commercial jobs where it absolutely must be done to a timetable.
I can't pin or glue the track down n the viaducts yet, because I need access to the bridges and viaducts themselves to finish off some of the detailing and painting, and also to the LT tracks behind to finish off the third and fourth rail laying.
I am also giving thought to the wiring of the tracks on the viaducts: I may leave the main bridge across the LT tracks plus the lattice bridge as a separate piece of lift-off scenery, which means wiring down through the hollow bridge abutment and having the ability to unplug or unscrew the wiring connections (possibly using a 4-pin plug and socket. The rest of the viaducts can eventually be glued down, so wiring the tracks on those will only mean threading the wires down a few piers.
Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Full Member

Last edit: by SRman
Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Full Member
Cheers MIKE
I'm like my avatar - a local ruin!
I'm like my avatar - a local ruin!
Posted
Full Member
Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Posted
Inactive Member
Last edit: by The Q
Now I've finally started a model railway…I've inherited another…
Posted
Full Member
Jeff Lynn,
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
Amateur layabout, Professional Lurker, Thread hijacker extraordinaire
1 guest and 0 members have just viewed this.

