00 Gauge - Devan and Summersett V4
Posted
Full Member
Staying on the thread Kevin.
Posted
Full Member
'Petermac
Posted
Site staff
Have been involved on other layouts, etc plus timetables etc on mine
During one session. one of the crew took on the role of Dispatcher/ Train Controller using these two panels which requires one to turn around to work them
and he suggested that both panels be integrated into one to replace the one above these words.
Well this is it
Not only turnouts out on the mainline & storage but signals as well
We all know DCC only requires 2 wires but this panel has 88 of them !!!
So far, got half of the LEDS ( & there are plenty of them 13 bi-colour & 25 single colour beasts) wired, then to to do pushbuttons for signals & toggles for turnouts.
I think when this wired, it will take me a few days to replace the other two - may even have to cancel one of the 2 operate sessions I have a month.
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Full Member
He’s still going to have to turn around to see what’s going on isn’t he?
ATB
Posted
Full Member
Cheers Pete.
Posted
Full Member
Posted
Site staff
new train layout system will be Hornby/Triang clockwork …..
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Full Member
That would be a mistake Sol - DCC is just a simple 2 wire system ……..
'Petermac
Posted
Full Member
Cheers Pete.
Posted
Site staff
just like mine - neat at the front…. don't look at the back !!!!That looks nice and neat Sol. So does mine… from the front.
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Full Member
[user=1120]peterm[/user] wrote:just like mine - neat at the front…. don't look at the back !!!!That looks nice and neat Sol. So does mine… from the front.
Cheers Pete.
Posted
Site staff
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Full Member
Cheers Pete.
Posted
Full Member
How many levels do you have in there and is 12" the standard clearance between levels ? Just wondering because I'm starting with my high level section and not really sure what minimum clearance to allow................
'Petermac
Posted
Site staff
The Newton Abbot tracks on the LHS are approx 6 inches above to datum while the tracks under Charde in the middle are about 3 inches lower.
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Full Member
Once I move my layout down to they new train room in Denmark there will be room for a similar expansion.
I shall watch yours with interest.
cheers
Posted
Full Member
Only 3 inches above and below datum - you're not expecting any derailments !!
You're moving your train room to Denmark Marty I'm assuming this is still in or around Perth or are you actually coming to Europe ?
'Petermac
Posted
Site staff
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Full Member
John.
Posted
Full Member
What are those sticky-up things - point motors ?
'Petermac
1 guest and 0 members have just viewed this.