00 Gauge - Devan and Summersett V4
Posted
Inactive Member
I rarely get to look at the Home Page, as I usually go in by the email links.
Max
Port Elderley
Port Elderley
Posted
Full Member
Marty
Posted
Full Member
D&S Layout very nice, I like your re build plan, s. New ideas always welcome.
Had you found place for Mill Wear House, Last model build.
Up Date plus pic, s please.
Best of Luck From South Wales U.K.
Noviceman.
Posted
Site staff
I haven't built the Mill warehouse - I was just advising all of the new release - I have no room for it….
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Full Member
Staying on the thread Kevin.
Posted
Site staff
Hi Ron. The "Fun" with code 83 and code 100, was that "Tongue in Cheek"? And did you have to use a file??All the best. Kevin
Solder a code 100 metal fishplate to code 100 rail for 50% of the fishplate length, flatten the other 50% & solder the code 75/83 rail to this flattened piece of fishplate ( with the inside edges of both code 75 & 100 in alignment.)
A file just to touch the top surface up.
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Full Member
Staying on the thread Kevin.
Posted
Site staff
Noviceman, there is a N scale version on this postHad you found place for Mill Wear House, Last model build.
Best of Luck From South Wales U.K.
Noviceman.
http://yourmodelrailway.net/view_topic.php?id=15110&forum_id=21&jump_to=273256#p273028
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Site staff
this one shows all the wires but they are very hard to see normally.
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Full Member
Staying on the thread Kevin.
Posted
Full Member
Mike
Pig Hill Yard - a small Inglenook shunting layout for my boys, in 00.
Pig Hill Yard - a small Inglenook shunting layout for my boys, in 00.
Posted
Site staff
this is basic as of now
planned & with signals & interlocking, crashes at the diamonds should be few & far…(hopefully)
as I have a NMRA meeting at my place May 11, after that is when I start the track changes ( existing scenery removal can start now… )
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Full Member
Looking forward to it. Presumably all the main buildings will remain as now ………………….. :hmm
'Petermac
Posted
Full Member
Staying on the thread Kevin.
Posted
Site staff
I think minor changes at Watchit - I think…..Wow - that's major works Sol.
Looking forward to it. Presumably all the main buildings will remain as now ………………….. :hmm
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Site staff
Ed
Posted
Full Member
Last edit: by Marty
Posted
Site staff
As I have turnouts interlocked currently between Devan & Bruton Jns, I can interlock the turnouts at XXXX & YYYY, star to star
so while the purple track gets used for two different routes , this means a lot less work than having so many diamonds and 3 tracks across the liftup which I must admit I was not sure how to do it without completly ruining Devan Junction .
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Site staff
Ron
NCE DCC ; 00 scale UK outline.
NCE DCC ; 00 scale UK outline.
Posted
Full Member
Good luck with version II
1 guest and 0 members have just viewed this.