Going large - building large layouts

Post

Posted
Rating:
#257833
Avatar
Site staff
Barchester is in the usergroup ‘Super-moderators’
Space. . . The final Frontier. . .  :shock:. . . Start at one end Barry and keep your back turned to the rest as you go. . Soon your back will hit the far wall and you'll be thinking. . . 
Wonder if I can Extend   :hmm


Looking good so far  :doublethumb

Cheers

Matt

Wasnie me, a big boy did it and ran away

"Why did you volunteer ? I didn't Sir, the other three stepped backwards"
Online now: No Back to the top

Post

Posted
Rating:
#257836
Avatar
Full Member
Look at that S  P A C  E !! Oh my!  Steady as she goes. You are doing famously!


Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#257838
Sol
Avatar
Site staff
Sol is in the usergroup ‘Super-moderators’
Like a Tardis ??  small on the outside but inside ??????

Ron
NCE DCC ; 00 scale UK outline.
Online now: No Back to the top

Post

Posted
Rating:
#257848
Avatar
Full Member


"Did someone order a baseboard?"

200 metres of PSE timber and a pile of 4mm and 9mm plywood arrives on a palette by truck and crane. 

I haven't been this excited since a bloke turned up in a giant concrete truck for the shed base pour!!

Tomorrow I start fitting the plywood lining and will then do the ring main electrics and outside lights.  My next-door neighbour's grandsoon (who is 8) is as excited as I am about the layout and can't wait apparently for restictions to lift so he can come and run some trains.  No pressure there, then………….

Shed dweller, Softie Southerner and Meglomaniac
Online now: No Back to the top

Post

Posted
Rating:
#257851
Avatar
Full Member
Hi Barry.   Just as well that you are organised. Luckily you have got a drive, do you do coach parties too?      Best wishes Kevin

Staying on the thread Kevin.
Online now: No Back to the top

Post

Posted
Rating:
#257903
Avatar
Full Member
Just a quick update - photos to follow.

Today was a "shed day" so I had the chance to cut the 3mm ply into 500mm widths for lining the roof.  The wall where the storage sidings are going is now fully lined as is the section on the scenic side below the baseboard height.  I will be adding the scenic backboards next and have just plugged into a local artist group  who are coming to look at my proposal that someone paints the scenic backscene with "sky".  Lincolnshire/South Yorkshire is very flat so I don't need hills etc!!

I am targetting the end of May to have the lining complete, the gaps filled/sanded, everything painted a base blue colour  and the electrics in.  There will be a ring main for the fridge, heating, hoover etc and then a switched radial circuit for power supplies, controllers, soldering iron etc.  That way, I can switch everything off from one switch and know that I have not left anything on overnight.  As previously mentioned, I have bought a number of double plug sockets coloured red for this circuit.

The 9mm plywood is for the baseboard tops, supported by the 3x1(nominal) PSE.  I am using 2x2 (nominal) PSE for legs.  All other things being equal, that suggests that I can do my detailed measuring/planning in early June and then start baseboard construction.  I am minded to build all of the outer baseboards first rather than just the storage area.  That way, I can draw out the alignments for the main line etc to ensure that it all fits as planned.  I have found AnyRail to be very accurate but I'm not sure if that accuracy extends to something 26 feet long!!

I must also get to unpack all of the boxes still containing my railway "stuff".  In there, I am hoping to find the pointwork, pins, joiners, switches. heat shring, tag-strip, wire and other paraphanalia that I bought during the move/lockdown period.  It should also reveal my toolkits, glues, bench power supplies etc etc.

Track-laying is pencilled in for the middle/end of June.

Something that has kept me going is my collection of notes, wiring diagrams and pictures showing how I am proposing to do things.  Thankfully, I am still able to read my own writing and understand my hand-drawn sketches!!

Barry

Shed dweller, Softie Southerner and Meglomaniac
Online now: No Back to the top

Post

Posted
Rating:
#257912
Avatar
Full Member
The adventure begins!!! It should be a very busy and interesting period between now and Autumn.Please don't neglect to document it with loads of pictures Barry!
Cheers,John.B.:thumbs
Online now: No Back to the top

Post

Posted
Rating:
#257915
Avatar
Full Member
Hi John

I will do my best to keep everyone updated without over-doing it!!

Barry

Shed dweller, Softie Southerner and Meglomaniac
Online now: No Back to the top

Post

Posted
Rating:
#257921
Avatar
Full Member
As promised - pictures showing the storage siding side and the scenic side boarded below baseboard height.  I've managed a bit more today so now have the storage siding wall completed and the lower parts of the ceiling done on both sides.  Later this week I will finish the scenic side, the far end wall and the rest of the ceiling.





You will appreciate the "Chinese Puzzle" aspect mentioned earlier!!  Every hour of carpentry is accompanied by 20 minutes of moving things!!!

Barry

Shed dweller, Softie Southerner and Meglomaniac
Online now: No Back to the top

Post

Posted
Rating:
#257928
Inactive Member
Now that's a project

Cheers
Evan
Online now: No Back to the top

Post

Posted
Rating:
#257932
Avatar
Site staff
Barchester is in the usergroup ‘Super-moderators’
You will certainly be getting your daily step count in running up and down the length of that shed Barry,  :thumbs
Good progress so far and getting closer to that FIRST bit of track goingbdown  :Happy

Cheers

Matt

Wasnie me, a big boy did it and ran away

"Why did you volunteer ? I didn't Sir, the other three stepped backwards"
Online now: No Back to the top

Post

Posted
Rating:
#258112
Avatar
Full Member
Good evening all

I recently posted that I had spent a bit of time doing house stuff and other unimportant things (like being married, being a Dad and Grandad etc) only for Peter Mac to have a go at me - so this week I thought I had better put in a shift to avoid his further wrath!!! :lol: :lol:

The shed lining is now complete, I have fitted a rail of 3" x 1" PSE at waist level to carry the electrical ring main and the switched mains sockets (as described above somewhere), mounted the sockets awaiting some wiring, filled all the lining joins above baseboard height, sorted out the remaining timber so that I can actually move in the place, opened and sorted all of the boxes and crates of stuff that will be absorbed by the layout - I now have boxes of just electrical stuff, tools, scenery, buildings, trees etc - modified my plan to fit the exact shed area (the plan was 1 3/4 inches too long and 3/4 inch too wide (it doesn't sound much but my storage sidings are calculated to the nearest 30thou!!!!!) AND managed to take Mrs M to lunch a couple of times to ensure that future shed days happen.

As it goes, tomorrow we have a small snagging list of jobs and after that, the house renovation is as finished as we can get it.  Just waiting on some flooring and the bloke to do the patio.  Time then to start some modelling you ask?

Nearly - we've got some decorating to do in some flats we are going to rent out but Mrs M is more than capable - or so I tell her  :lol: :lol: :lol:

In the next week or so, baseboards will emerge from the pile of timber recently delivered so I will post some pictures of those with, perhaps, an engine or two so that you can get a feel for the scale of the project.

I must keep looking busy in case Peter Mac is reading this  :pedal :pedal :pedal

Barry

Last edit: by Barry Miltenburg


Shed dweller, Softie Southerner and Meglomaniac
Online now: No Back to the top

Post

Posted
Rating:
#258113
Avatar
Site staff
Barchester is in the usergroup ‘Super-moderators’
[user=2006]Barry Miltenburg[/user] wrote:
Good evening all

 I recently posted that I had spent a bit of time doing house stuff and other unimportant things (like being married, being a Dad and Grandad etc) only for Peter Mac to have a go at me - so this week I thought I had better put in a shift to avoid his further wrath!!! :lol: :lol:

The shed lining is now complete, I have fitted a rail of 3" x 1" PSE at waist level to carry the electrical ring main and the switched mains sockets (as described above somewhere), mounted the sockets awaiting some wiring, filled all the lining joins above baseboard height, sorted out the remaining timber so that I can actually move in the place, opened and sorted all of the boxes and crates of stuff that will be absorbed by the layout - I now have boxes of just electrical stuff, tools, scenery, buildings, trees etc - modified my plan to fit the exact shed area (the plan was 1 3/4 inches too long and 3/4 inch too wide (it doesn't sound much but my storage sidings are calculated to the nearest 30thou!!!!!) AND managed to take Mrs M to lunch a couple of times to ensure that future shed days happen.

As it goes, tomorrow we have a small snagging list of jobs and after that, the house renovation is as finished as we can get it.  Just waiting on some flooring and the bloke to do the patio.  Time then to start some modelling you ask?

Nearly - we've got some decorating to do in some flats we are going to rent out but Mrs M is more than capable - or so I tell her  :lol: :lol: :lol:

In the next week or so, baseboards will emerge from the pile of timber recently delivered so I will post some pictures of those with, perhaps, an engine or two so that you can get a feel for the scale of the project.

I must keep looking busy in case Peter Mac is reading this  :pedal :pedal :pedal

Barry

Pot, Kettle Black. . Nuff said  :mutley

Wasnie me, a big boy did it and ran away

"Why did you volunteer ? I didn't Sir, the other three stepped backwards"
Online now: No Back to the top

Post

Posted
Rating:
#258116
Avatar
Full Member
[user=2006]Barry Miltenburg[/user] wrote:
Hi all

I'd better put you out of your misery and confirm that we are, indeed, in the seaside town that had a couple of LYR stations and a CLC one as well - I'm told it used to be Lancashire - sore point apparently.
In other news, I get jabbed on Friday.  If some of the conspiracy theories are true, I might be modelling the GWR by Saturday
 Barry
Barry,

Just playing catch up. By any chance did the old station become a supermarket car park? Strangely enough the same fate seems to have fallen on both Weston and Clevedon of my interest so I imagine it's not uncommon

Also how are your GWR Kings running now?  :mrgreen: :mrgreen:

Online now: No Back to the top

Post

Posted
Rating:
#258119
Avatar
Full Member
Hi Colin
Yes, one station is now Morrison’s!!

Luckily, no after-effects from the first jab but I have the second one on Bank Holiday Monday so there’s still time to get Swindonised!!

Last edit: by Barry Miltenburg


Shed dweller, Softie Southerner and Meglomaniac
Online now: No Back to the top

Post

Posted
Rating:
#258291
Avatar
Full Member
Electrics now sorted, temperature controlled cooler fans running (its sunny on a British Bank Holiday !!!) and baseboard construction under way.  Yes - that does say 29.6 degrees on the display!!  Once running for half an hour, it was down to 23.  The actual fan is a Dyson Air Cool unit.  It remains to be seen if the unit is sufficient on its own to cope with the long hot British summers  :lol: :lol:



The baseboards are 9mm ply supported by a frame of 3" x 1" PSE.  Legs are 2" x 2", notched to accept the bracing pieces.  This second view also shows the white ring-main sockets and the red (switched) sockets that I can turn off from the doorway.


 Taken from the entrance to Trinity Square station, this view shows (1) how much of a mess the shed remains, despite my best efforts, (2) the ambience now that the 8 "daylight" LED tube lights have been wired in and (3) the amount of household storage I will have down the right hand side where the storage baseboard is 3ft wide and 4ft high.  The white marks on the walls to the left are filler - used where the plywood lining is joined.  This will be smoothed and painted a sky blue colour in due course. 

My flooring guy dropped off some 2ft x 2ft carpet tiles today asking when it was convenient for him to come and lay them, once I had cleared the space!!  Needless to say, he left the spray adhesive and I will be doing them myself.

Bashing on……………

Shed dweller, Softie Southerner and Meglomaniac
Online now: No Back to the top

Post

Posted
Rating:
#258297
Avatar
Full Member
Ah... the clutter... my layout room is much the same. I like the exposed roof trusses.

Marty
N Gauge, GWR West Wales
Newcastle Emlyn Layout.
Newcastle Emlyn Station is "Under construction"
Online now: No Back to the top

Post

Posted
Rating:
#258300
Avatar
Full Member
If you glue your carpet tiles down, you'll have a devil of a job replacing any.  Why not just use carpet tape to hold a couple of lines then the others just sit in between ?

I envy you your space Barry.   

'Petermac
Online now: No Back to the top

Post

Posted
Rating:
#258302
Avatar
Full Member
[user=6]Petermac[/user] wrote:
If you glue your carpet tiles down, you'll have a devil of a job replacing any.  Why not just use carpet tape to hold a couple of lines then the others just sit in between ?

I envy you your space Barry.   
Barry will suck them up every week during his routine vacuuming run, that's why
Online now: No Back to the top

Post

Posted
Rating:
#258304
Avatar
Full Member
Hopefully the carpet tile glue supplied by the contractor is the low tack stuff which permits easy replacement, although I rather fancy with all his research, Barry knows what he's doing by now.

 Anyroad, impressive work output Barry and we can tell that you're enjoying the regained freedom to model!

Best,

Bill

Last edit: by Longchap


At 6'4'', Bill is a tall chap, then again, when horizontal he is rather long and people often used to trip over him! . . . and so a nickname was born :)
 
Online now: No Back to the top
1 guest and 0 members have just viewed this.