Video Archive         Recent Topics      
YMR logo

You are here:  Your Model Railway Club > Getting You Started. > Layout Design, Trackwork & Operation. > Operating points To bottom of page
                 

 Moderated by: Spurno
Start New Topic Reply Printer Friendly

Operating points - Layout Design, Trackwork & Operation. - Getting You Started. - Your Model Railway Club
AuthorPost
 Posted: Sun Feb 14th, 2021 12:23 pm
PMQuoteReply
link to this 1st post
Petermac
Moderator


Joined: Sat Oct 13th, 2007
Location: Nr Bergerac, France
Posts: 18154
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

I'm putting this in here bacause it does relate to trackwork and it's operation.................

I bought the basic Megapoints system a few years ago having been impressed by watching the signal bounce effect on his demonstration stand at a show.  Operating points with it was not my main reason for purchase ..................

I used it very successfully on about half a dozen servo operated points on the old Maxmill layout but soon after it's installation, we sold the house and the layout was dismantled.

I have recently upgraded and updated both the hardware and software to enable me to use his latest "plug and play" system.

It's probably not particularly cheap but it's so easy to use, does exactly what it says on the box, has excellent "how to" videos and head office back-up all coupled with a very speedy dispatch timetable.

Anyone thinking of installing remote controlled points or any other "electrickery"  ought to spend some time watching the videos which clearly explain what each module does.

Here's the link :   https://megapointscontrollers.co.uk/?v=11aedd0e4327

I have absolutely no connection with the company other than the fact that he's recently reduced my UK bank balance ................

Oh, it might also be worth mentioning that I had no "post-Brexit" duty or VAT problems with my order which arrived here in around 7 days - the "pre-Brexit" expected timescale for parcvels from UK.  Some UK suppliers currently refuse to post to the Continent, which is a bit of a problem for someone modelling UK outline !!




____________________
'Petermac
Back To Top PMQuoteReply

This is topic ID = 16620     Current time is 09:34 am  
You are here:  Your Model Railway Club > Getting You Started. > Layout Design, Trackwork & Operation. > Operating points
You can type a quick reply to this topic here. Click in the box below to begin.

Or to reply to an individual post, or to include images, attachments and formatted text,
click the Quote or Reply buttons on each post above.

To start a new topic in this forum, click the Start New Topic button below.
To start a new topic in a different forum, click the Forum Jump drop-down list below.
Start New Topic

Back to top of page

           
15 Most Recent Topics

Problems with this web site? Please contact the Webmaster.

All material submitted to this web site is the responsibility of the respective contributor. By submitting material to this web site you acknowledge that you accept full responsibility for the material submitted.
Unless stated otherwise, all the material displayed on this web site, including all text, photographs, drawings and other images, is copyright and the property of the respective contributor. Registered members are welcome to use it for their own personal non-commercial modelmaking purposes. It must not be reproduced or re-published elsewhere in any form, or used commercially, without first obtaining the owner's express permission.
The owner of this web site may edit, modify or remove any content at any time without giving notice or reason.    © 2008

                 

Recent Topics Back to top of page

Powered by UltraBB 1.15 Copyright © 2007-2011 by Jim Hale and Data 1 Systems. Page design copyright © 2008-2013 Martin Wynne. Photo gallery copyright © 2009 David Williams.