Video Archive         Recent Topics      
YMR logo

You are here:  Your Model Railway Club > Model Railway Layouts. > Members Personal Layouts. > Chelford, Oxsea and Battenham - OO Scale To bottom of page
                 

 Moderated by: Spurno Page:  First Page Previous Page  ...  14  15  16  17  18  19   
Start New Topic Reply Printer Friendly

Chelford, Oxsea and Battenham - OO Scale - Members Personal Layouts. - Model Railway Layouts. - Your Model Railway Club
AuthorPost
 Posted: Thu Mar 15th, 2018 09:32 pm
PMQuoteReply
link to this 361st post
BromsMods
Full Member


Joined: Mon Oct 15th, 2007
Location:  
Posts: 497
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Today I have started putting in the 3rd rails around Chelford station.  My goodness these are fiddly bits to deal with.  I'm just thankful that I had already cut out all of the necessary pieces from the sprues.



____________________
Regards

John Russell
Bromsgrove Models
Back To Top PMQuoteReply

 Posted: Thu Apr 5th, 2018 04:55 pm
PMQuoteReply
link to this 362nd post
BromsMods
Full Member


Joined: Mon Oct 15th, 2007
Location:  
Posts: 497
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

The last couple of weeks have been a little frustrating.  Having carried on with installing as many long lengths of 3rd rail as I could I then had to stop work on the railway, discovering damp in the "gardening" corner of the shed.  I had to lift the carpet and clean off the black areas on the lower walls in the corner of the shed where I keep mostly garden implements and equipment.  Then I had to let the floor area in the corner dry out before putting clear mastic along the floor/wall join.  I also put a strip of timber along the outside of the shed between the existing outer shipboard layer and the internal frame, just as a precautionary measure in case there was moisture getting in from below.

Having got back to the railway I then decided that I really didn't like the 3-way point at the right hand end of Chelford station and I have been wrestling since then with various point/track combinations, none of which I have been particularly happy with.  I'll have to see if I can solve the issues later this afternoon.



____________________
Regards

John Russell
Bromsgrove Models
Back To Top PMQuoteReply

 Posted: Thu Apr 5th, 2018 06:15 pm
PMQuoteReply
link to this 363rd post
Passed Driver
Full Member


Joined: Thu Feb 19th, 2015
Location: Peckham, United Kingdom
Posts: 2055
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Hi John.    Have you put any thought into “ an arrangement of Y points “ ? Laid close together they can make an interesting alternative to a three way track plan .  Best wishes. Kevin



____________________
Staying on the thread Kevin.
Back To Top PMQuoteReply

 Posted: Sun Apr 15th, 2018 05:49 pm
PMQuoteReply
link to this 364th post
BromsMods
Full Member


Joined: Mon Oct 15th, 2007
Location:  
Posts: 497
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Hi Kevin

No, I don't have enough room for that sort of arrangement, so I have decided to lose one of the sidings I had planned and use large radiius points.  Getting to the far corner of the layout is a challenge, even using the folding steps my wife bought me, but I have managed to paint the plasterboard around the corner pale (sky?) blue and also finished painting the baseboard before laying the new pointwork and two sidings.  Just need to fit point motors.

Also need to construct the main platform of Chelford before I can ballast the track and add 3rd rails.

Last weekend I was in Kent at my brother's house and did a little more for him on his N gauge layout.  It made me realise that I am much happier with HO/OO scale!!  However, I did fit a couple of decoders in some EMUs he had, including the Hornby/Arnold Brighton Belle (for which I have added a guide at https://clarahost.clara.net/www.bromsgrovemodels.co.uk/arnold_5BELdccinstr.htm).  At first the loco wouldn't run very well but I found that running it in and lightly oiling the worm gears over each bogie now allow it to run properly.

This week I need to do some soldering to add control boards for some Traintronics signals I have installed on the Chelford board and also to wire in the buffer stop lights on four sidings.



____________________
Regards

John Russell
Bromsgrove Models
Back To Top PMQuoteReply

 Posted: Sun Apr 15th, 2018 06:21 pm
PMQuoteReply
link to this 365th post
Passed Driver
Full Member


Joined: Thu Feb 19th, 2015
Location: Peckham, United Kingdom
Posts: 2055
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Hi John   It was just an idea, that I picked up on YMRC. Sky blue may work for my backscene?Best wishes. Kevin



____________________
Staying on the thread Kevin.
Back To Top PMQuoteReply

 Posted: Sun Apr 15th, 2018 06:37 pm
PMQuoteReply
link to this 366th post
BromsMods
Full Member


Joined: Mon Oct 15th, 2007
Location:  
Posts: 497
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Passed Driver wrote: Sky blue may work for my backscene?

That's what I was hoping!!!  At least it gives a base on which to build something!



____________________
Regards

John Russell
Bromsgrove Models
Back To Top PMQuoteReply

 Posted: Sun Apr 15th, 2018 06:46 pm
PMQuoteReply
link to this 367th post
Passed Driver
Full Member


Joined: Thu Feb 19th, 2015
Location: Peckham, United Kingdom
Posts: 2055
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Cheers John    Who would have thought , that one small layout would cause so many questions? Best wishes. Kevim



____________________
Staying on the thread Kevin.
Back To Top PMQuoteReply

 Posted: Sat Apr 21st, 2018 10:29 pm
PMQuoteReply
link to this 368th post
BromsMods
Full Member


Joined: Mon Oct 15th, 2007
Location:  
Posts: 497
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Haven't got anywhere near the shed this last week, let alone the soldering.  Too much to do in the garden once the weather changed for the better and it stopped raining (at last!).  Not going to be able to do anything now for a few weeks with other commitments but will try to get Chelford board completed as soon as possible.



____________________
Regards

John Russell
Bromsgrove Models
Back To Top PMQuoteReply

 Posted: Fri May 25th, 2018 03:43 pm
PMQuoteReply
link to this 369th post
BromsMods
Full Member


Joined: Mon Oct 15th, 2007
Location:  
Posts: 497
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Having been abroad for the last four weeks and then confronted by some high temperatures which made it impossible to spend any time in the shed, I only managed yesterday to get in for just a few minutes.

I have finally managed to get the last Tortoise motor installed on one end of a double slip outside the main Chelford approach. I thought I had finished installing point motors at this end of the station but discovered one point that didn't throw when I expected it to!  I also had great difficulty fitting the motor as the hole for the actuator arm wasn't quite big enough so I had to use my Dremel with a grinding attachment to make the hole a little larger from beneath (the double slip is already fixed in position and ballasted!).  However, when I left it yesterday all was working well.  Too wet today to get anywhere near the shed.......



____________________
Regards

John Russell
Bromsgrove Models
Back To Top PMQuoteReply

 Posted: Sat Jun 2nd, 2018 07:51 pm
PMQuoteReply
link to this 370th post
BromsMods
Full Member


Joined: Mon Oct 15th, 2007
Location:  
Posts: 497
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Fortunately we have missed most of the heavy storms that have been around this week, but it has been very warm in the garden and quite hot in the shed which has had the sun on it most days.  This means that I have only been able to spend up to an hour at a time in there, with temperatures well over 30 degrees most days.

Today, however, I managed to complete the installation of track and point motors on the Chelford section of the layout - another milestone completed!!  I just need to build the platform for the main station building, ballast the track, paint it, install 3rd rails and signals ........ and I'm sure there is something else I've temporarily forgotten!

Then I can start on the engine shed/turntable board.....



____________________
Regards

John Russell
Bromsgrove Models
Back To Top PMQuoteReply

 Posted: Sun Jun 3rd, 2018 06:37 am
PMQuoteReply
link to this 371st post
Passed Driver
Full Member


Joined: Thu Feb 19th, 2015
Location: Peckham, United Kingdom
Posts: 2055
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Hi John    The Hot Shed problem? I don’t know if you have enough clearance for insulation inside the roof?  Or you could plant a sedum roof “ , they are supposed to keep the inside cool.  Best wishes.  Kevin



____________________
Staying on the thread Kevin.
Back To Top PMQuoteReply

 Posted: Sun Jun 3rd, 2018 07:40 am
PMQuoteReply
link to this 372nd post
BromsMods
Full Member


Joined: Mon Oct 15th, 2007
Location:  
Posts: 497
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Hi Kevin

Walls and roof are well insulated  - I did that years ago before I started on the layout.  As for sedum, I'm not sure the roof is that strong!!  I'm also not sure I would want to provide creepy crawly things with another medium to provide access inside.  I already battle with spiders and the occasional ant (which in itself is a recent and somewhat worrying occurrence as they must be getting in from underneath and I have so much stuff stored under the layout).



____________________
Regards

John Russell
Bromsgrove Models
Back To Top PMQuoteReply

 Posted: Sun Jun 3rd, 2018 10:02 am
PMQuoteReply
link to this 373rd post
Passed Driver
Full Member


Joined: Thu Feb 19th, 2015
Location: Peckham, United Kingdom
Posts: 2055
Status: 
Offline

My photos:
view photos in Gallery
view photos as slides

Hi John.   Thank you for your reply. That is a good point that you have made there.  Best wishes. Kevin



____________________
Staying on the thread Kevin.
Back To Top PMQuoteReply

This is topic ID = 12327     Current time is 02:16 pm Page:  First Page Previous Page  ...  14  15  16  17  18  19     
You are here:  Your Model Railway Club > Model Railway Layouts. > Members Personal Layouts. > Chelford, Oxsea and Battenham - OO Scale
You can type a quick reply to this topic here. Click in the box below to begin.

Or to reply to an individual post, or to include images, attachments and formatted text,
click the Quote or Reply buttons on each post above.

To start a new topic in this forum, click the Start New Topic button below.
To start a new topic in a different forum, click the Forum Jump drop-down list below.
Start New Topic


Back to top of page

           
15 Most Recent Topics

Problems with this web site? Please contact the Webmaster.

All material submitted to this web site is the responsibility of the respective contributor. By submitting material to this web site you acknowledge that you accept full responsibility for the material submitted.
Unless stated otherwise, all the material displayed on this web site, including all text, photographs, drawings and other images, is copyright and the property of the respective contributor. Registered members are welcome to use it for their own personal non-commercial modelmaking purposes. It must not be reproduced or re-published elsewhere in any form, or used commercially, without first obtaining the owner's express permission.
The owner of this web site may edit, modify or remove any content at any time without giving notice or reason.    © 2008

                 

Recent Topics Back to top of page

Powered by UltraBB 1.15 Copyright © 2007-2011 by Jim Hale and Data 1 Systems. Page design copyright © 2008-2013 Martin Wynne. Photo gallery copyright © 2009 David Williams.